BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2024 at 8:00 PM

Updated May 24, 2024

This is a service / maintenance or supply contract in Columbia, South Carolina. Contact the soliciting agency for additional information.

Synopsis: Fort Jackson Generator Monitoring requirement. This is a Sources Sought Synopsis announcement; a market survey for information only, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow-up information requests. The purpose of this synopsis is to gain knowledge of potential HUBZone, Small Businesses and Service-Disabled Veteran Sources, Small Disadvantaged Businesses 8(a), Women Owned Businesses or large business interest in the Greater Columbia, SC region. Contractor's status will be verified through SAM and SBA. This notice is for planning purposes only. All interested parties should respond. The MICC-Fort Jackson may issue a solicitation and award of a contract for "Fort Jackson Generator Monitoring," subject to availability of funds. The MICC-Fort Jackson is seeking qualified, experienced and capable sources to provide equipment, equipment maintenance and monitoring for up to 20 generators located at Fort Jackson. Federal environmental regulations 40 CFR Part 60 Subpart IIII, JJJJ and 40 CFR Part 63 Subpart ZZZZ require the owner/operator of generators to maintain records on-site of the date of operation and hours of operation for every start-up. Fort Jackson's generators are located at various sites throughout the installation, and most are difficult to physically monitor due to a lack of manpower. Existing wireless cellular devices on each generator send data to a monitoring web site that provides real-time monitoring information, alleviates the need for additional personnel and enables the installation to meet regulatory requirements. Full details are provided in the attached performance work statement. The place of performance is the Fort Jackson South Carolina 29207. All interested concerns will provide this office, in writing, a notice stating their positive intention to submit a proposal no later than 1400hrs on 22 May 2024 by completing and signing the Source Sought Information Request Form (link to form below). Please return this via email to: tonya.l.goines.mil@army.mil and jason.m.fronden.civ@army.mil. Include the following in the subject line - Fort Jackson Generator Monitoring. No facsimile responses will be honored. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Military

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
2
Bidding Soon
766
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2024

Project location map

2576 Essayons Way, Columbia, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.