Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Batavia, Illinois. Contact the soliciting agency for additional information.
The Offeror shall provide all personnel, supplies, supervision, tools, materials, equipment, transportation and other items and non-personal services necessary to provide backflow preventer maintenance services in accordance with this Statement of Work (SOW) except as those items specified as government furnished property and services. The Offeror shall perform to the standards in the contract as well as all local, state and federal regulations. The Offeror shall be responsible for all damages to persons or property occurring because of the Offeror's fault or negligence. Offeror shall furnish all tools and equipment necessary to test approximately 121 backflow devices. Upon award, FRA will provide the selected Offeror with a list of devices to be tested. FRA reserves the right to add or remove devices from the subcontract. The Offeror must be equipped with current calibrated testing gauge(s). Proper calibrations shall be done in accordance with the manufacturer, FRA, and state requirements. If necessary, FRA will ask for records of calibration of devices. Offeror shall complete testing of all devices and providing test reports to the FRA within 90 calendar days counting from the date of issuance of the purchase order. Test Reports: FRA will provide Offeror with pre-printed test report form with specific information on each device. The Offeror, upon completion of testing of the device, shall complete, sign and submit to the FRA within five (5) days of the date of the test. Offeror is responsible for all safety measures. Most of the Laboratory backflow preventers are located inside our buildings and proper precautions must be taken when working on them. Offeror must be familiar with and practice all State and Federal OSHA codes and requirements. Existing improvements, such as, sidewalk, walls, soft and hardscape, etc. are to be protected in place. Any damage to existing improvements shall be immediately reported to the FRA and repaired or replaced at the Offeror's expense in a timely manner and to the satisfaction of the FRA. No new access points will be allowed within the boundaries/scope of this project. Offeror is to prepare estimates for work based upon the existing ingress/egress to the device locations. Offerorshall complete repairing of damaged devices within 90 calendar days counting from the day of issuance of Repair Authorization. Failed Assembly: If an assembly fails the initial test, the subcontractor must determine if it is a minor repair, or a major repair is needed. Minor Repairs: For minor repairs, such as, simple cleaning or installation of a rubber repair kit, repairing cracked assembly, replacing check valve and/or relief valve, Offeror shall notify FRA and obtain authorization prior to the repairs. Minor repairs are expected to be done at the time of the initial test. Cost for re-test shall be included based on the agreed bid price per device. Major Repairs: Offeror shall provide written proposal for all major repairs such as cracked assemblies or replacement of check valves or assemblies. Proposals shall include all labor based on agreed bid hourly rate and materials necessary to complete the repair or replacement as well as the re-test once the repair or replacement is complete. This Offeror shall be awarded for (2) two-year base, with (3) three one-year option periods. The length of the subcontract shall be determined based on the Offeror's performance and funding availability. Offeror shall, adhere to Insurance Requirements for Professional Services dated 6.2022. Offeror shall pay prevailing wages in accordance with wage determination number 2015-5741 Rev 21 Dated 12/26/2023, 2015-5017 Rev 25 Dated 12/26/2023, and IL20240008 Modification 02/23/2024 (see attached) the attached wage determinations per the current Department of Labor wage rate, including all scheduled increases. Normal working hours are from 7:00 am to 3:00 pm. Working days shall be limited to Monday through Friday, excluding all FRA observed holidays, and no work will be permitted outside normal working hours except under extraordinary circumstances and with prior approval of the point of contract or service coordinator.
Post-Bid
Water / Sewer
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 20, 2024
July 19, 2024
To Be Determined, Batavia, IL
Related To This Project
Batavia, IL
Bid Date: Jul 31 2024
Batavia, IL
Bid Date: Jun 13 2024
Batavia, IL
Bid Date: Jul 25 2024
Batavia, IL
Bid Date: Oct 11 2024
Batavia, IL
Bid Date: Jun 20 2024
Batavia, IL
Bid Date: Jul 19 2024
Batavia, IL
Bid Date: Jul 10 2024
Batavia, IL
Bid Date: Jul 11 2024
Batavia, IL
Bid Date: Jun 07 2024
Batavia, IL
Bid Date: Jun 28 2024
Batavia, IL
Bid Date: May 21 2024
Batavia, IL
Bid Date: Jun 17 2024
Batavia, IL
Bid Date: May 08 2024
Batavia, IL
Bid Date: May 31 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.