BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Palmdale, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Q&A Deadline June 25, 2024 12:00 PM (PDT) The work may consist of but is not limited to: resurfacing of various local and arterial streets within the City of Palmdale as described in the project maps, including but not limited to City of Palmdale coordination and permitting, public notification, Caltrans coordination and permitting, traffic control plan development, traffic control implementation and maintenance, spatial inventory of utility infrastructure at the surface, micro-milling, roadway surface preparation, crack sealing / filling, skin patching, asphalt-concrete leveling course installation, asphalt-rubber aggregate membrane (ARAM) chip sealing, slurry sealing, cold milling, asphalt overlay with PMAC, adjustment of utility infrastructure, traffic loop replacement, signing and thermoplastic striping. This project has Base Bid Nos. 1 - 14 along with Additive Alternate A (Bid Item Nos. 15 - 18) and Additive Alternate B (Bid Item No. 19). The bidder must propose on all. The Base Bid Items consist of primary items. The Additive Alternate Bid Items represent two different resurfacing treatments for the cul-de-sacs in the project areas , which include a modified ARAM Cape Seal or a 1.5-in mill and 2.0-in PMAC overlay, in accordance with the project plans and specifications. City will expect awarded Contractor to be ready to start work within 2 weeks of award by City Council due to the limited weather window. License Requirements Class A Bid Valid 90 days after bid opening Liquidated Damages $1,000 per working day Estimated Bid Value 1250000 Start/Delivery Date July 23, 2024 to October 3, 2024 Project Duration 50 working days Question Deadline 06/20/2024 at 2:00 PM PT Online Q&A Yes Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% SCOPE OF WORK. The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer and/or his designee. The work may consist of but is not limited to: traffic control plans and implementation, SWPPP, public notifications, permitting, geolocation of utilities at surface; application of ARAM cape seal on local streets per 2021 SPPWC; culde-sac treatments with modified ARAM or PMAC overlay, micro-milling, localized repairs; utility adjustment; traffic loop replacement; and striping inventory and replacement. The work is estimated to cost approximately $1,250,000 and shall be completed in 50 working days. Note that City expects that the awarded Contractor will be ready and available to start work within 2 weeks of award by City Council due to the limited weather window.

Award

Roads / Highways

$1,421,725.00

Public - City

Paving, Site Work

4

16

11

6

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
112
Bidding Soon
2,251
All Active Projects
1,008
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

August 26, 2024

img_map_placeholder

Multiple Locations, Palmdale, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.