BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a parking garage in Crystal Lake, Illinois. Completed plans call for the renovation of a parking garage.

Project Name: Public Works Fleet Garage Concrete Replacement Site Address: 100 W Woodstock St City: Crystal Lake County: McHenry State/Province: IL Removal and replacement of structural concrete slab with associated work as called out in the plans and specifications. The Project consists of the removal and replacement of existing concrete garage slab. 1. Briefly and without force and effect upon the Contract Documents, the Work of this single prime Contract can be summarized as follows: removal and replacement of structural concrete slab with associated work as called out in the plans and specifications. Substantial Completion is required no later than October 31, 2024. Completion Date: September 20, 2024, plus extensions, if any, authorized by a Change Order issued pursuant to Subsection 2.2A of the Contract The Project consists of the removal and replacement of existing concrete garage slab. 1. Briefly and without force and effect upon the Contract Documents, the Work of this single prime Contract can be summarized as follows: removal and replacement of structural concrete slab with associated work as called out in the plans and specifications. Substantial Completion is required no later than October 31, 2024. Completion Date: September 20, 2024, plus extensions, if any, authorized by a Change Order issued pursuant to Subsection 2.2A of the Contract Changes in the Project scope of work affecting the project cost can be made only through AIA Document G701 - Change Order. 1. The procedures for processing changes in the scope of Work are listed as follows: 2. The Architect prepares one of the following documents to modify the scope of work. Documents and attachments revising the drawings and specifications will be distributed electronically and the Contractor will be responsible for printing. a. Supplemental Instructions (SI) which are used for no cost changes. b. Proposal Request (PR) to be used for proposed changes that need written approval on cost prior to proceeding. c. Construction Change Directive AIA Document G714 (CCD) which is used when the work must proceed immediately and time and material cost submitted as soon as possible for review by the Architect. 3. The Contractor reviews and responds as follows: a. Supplemental Instructions (SI): This no cost change is to be carried out in accordance with the following modifications to the contract documents described herein. If this change effects cost, do not proceed with this change. Notify the Architect in writing within 10 days of receipt that an itemized (labor and material) quotation will be submitted within 21 days of initial receipt of this Supplemental Instruction. If a cost is not submitted within 21 days, this Supplemental Instruction will be accepted at no additional cost. b. Proposal Request (PR): Submit an itemized (labor and material) quotation for the proposed modifications to the contract documents as described herein within 21 days of receipt. If a cost is not submitted within 21 days, this Proposal Request can be accepted at no additional cost. Written approval is required prior to proceeding with this change. c. Construction Change Directive AIA Document G714 (CCD): Proceed immediately to carry out this change in the contract documents as described herein. If this revision effects cost, submit an itemized (labor and material) quotation within 21 days of receipt. If a cost is not submitted within 21 days this Change Directive will be accepted at no additional cost. 4. The Architect will review the Contractor's labor and material itemized quotation and respond in writing whether it is acceptable or needs revision. When all pricing is accepted by the Architect and Owner, a Change Order will be processed. Change Orders will be processed at increments determined by the Architect throughout the construction schedule. B. See the General Conditions of the Contract for Construction for methods of determining cost or credit, markup and schedule on submitting claims.

Bid Results

Parking Garage

$325,621.00

Public - City

Renovation

7

23

12

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
125
Bidding Soon
2,190
All Active Projects
952
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

August 5, 2024

img_map_placeholder

100 W Woodstock St, Crystal Lake, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.