BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and new construction of a mixed-use development in Nipomo, California. Working plans call for the construction of a 7,000-square-foot power facility; for site work for a power facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The County plans to construct an approximately 7,000 square foot, Sheriff's Substation with secure parking for patrol vehicles and unsecured parking for visitors using the Design-Build project delivery method. The Consultant being solicited by this RFP will provide Construction Management with Master Architectural Services and will be responsible for preparing the Bridging Documents to be used as the basis for final design by the Design-Build Entity selected in the future. The Bridging Documents will be prepared based upon a building program, and site analysis developed by the Consultant selected from this RFP. The new building shall include, but not limited to, office space, interview rooms, a multi-purpose room, community services rooms, administration offices, criminal investigation rooms, volunteer patrol rooms, report room, fitness room, locker rooms with showers, break rooms, staff restrooms, public restrooms, armory, access controls, utility/equipment rooms, storage space, and a kitchen including traditional appliances (e.g. stove, refrigerator, microwave). The intent is to build a user-friendly, accessible, safe, and healthy environment for the San Luis Obispo County Sheriff's Department. Purpose As the community of Nipomo in southern San Luis Obispo County continues to grow with residences, businesses, and infrastructure there is a corresponding need for an increase in emergency services. Currently the Sheriff's Office provides services out of the Oceano Patrol Station which is approximately 10 miles away from the community of Nipomo. Within the last 10 years, the number of service calls for southern San Luis Obispo County have more than doubled leading to a longer response time for both routine and emergency calls. Constructing a new Sheriff's Substation in Nipomo will allow Sheriff staff to work out of it thereby reducing response times for both routine and emergency calls in the Nipomo area as well as provide improved access to law enforcement services to the community. Environmental The existing parcel on which this project is proposed is currently vacant, with moderate native and non-native vegetative cover and some small oak trees. The parcel is absent of fencing or other improvements. The western property boundary is adjacent to an idle 8" petroleum pipeline and an active 12" petroleum pipeline. There are known environmentally sensitive areas on the site that will need to be addressed during the design phase of the project. Deadline for Final Questions May 24, 2024, by 5:00 p.m. All questions pertaining to the content of this RFP must be made in writing through online. Requests submitted after said date and time will not be considered. Questions will receive a response within approximately five (5) business days after receipt. Questions and responses will be posted online. Contract Negotiations June 28-July 15, 2024 Intent to Award Issued July 18, 2024 Award by Board of Supervisors August 2024 Notice to Proceed August 2024 The Consultant's proposal shall include each item required by this Request for Proposal. Any and all exclusions or exceptions to this RFP must be clearly stated in the Consultant's proposal. If exclusions or exceptions are not included in the initial proposal, the proposer waives their right to bring any up at a later date. The County reserves the right to reject all exceptions and any proposals, and to waive any irregularity or informality in any proposal or in the Request for Proposal process, as long as, in the judgment of the County, such action will not negate fair competition and will permit proper comparative evaluation of all proposals received. If you have any questions about the proposal process, please contact the Buyer directly(MISSY VILES)

Final Planning

Power Plant

$5,222,000.00

Public - County

New Construction, Paving, Site Work

3

11

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
10
Bidding Soon
251
All Active Projects
111
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2024

December 18, 2024

img_map_placeholder

W Tefft St & Carrillo St, Nipomo, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.