BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2024 at 8:00 PM

Updated June 5, 2024

Site work for a water / sewer project in Blackfoot, Idaho. Completed plans call for site work for a water / sewer project.

The work shall consist of replacing an existing stormwater drywell with a new underground stormwater infiltration system, piping, storm drains and removing the existing valley gutter at the south portion of Janet Street. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the Contract Documents, the plans, the Idaho Standards for Public Works 2020 Edition, and any applicable Federal, State and Local requirements Bid time frame is from July 1, 2024 to October 1, 2024 A bid bond in the amount of 5 % of the total bid amount is required.

Post-Bid

Water / Sewer

$600,000.00

Public - City

Site Work

8

8

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
14
Bidding Soon
153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

July 1, 2024

Project location map

Janet St, Blackfoot, ID


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.