Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 17, 2025 at 8:00 PM
Updated July 18, 2025
Site work for a road / highway in Big Sky, Montana. Completed plans call for site work for a road / highway.
PROJECT DESCRIPTION: Hand a total of approximately 560 feet of new 72" wide, full bench stock trail through two washed out avalanche ravines, within a non-motorized wilderness designation. s new trail ion with picks, rock bars, jack hammers, drilling and blasting. New ion is within extremely steep slopes, loose soils, extensive rock, eroding rock cliffs, outcroppings, and bedrock. Repeated, extensive surface and subsurface drilling and blasting will likely be necessary along numerous sections within these ravines to establish a 72" full bench trail, and remove excess material from the backslope and hillside above the trail. Use of rock drills, jack hammers, rock bars and picks will be necessary as well. A full bench trail cut down to a solid subsurface material will be crucial to trail longevity. Backslope will be reduced to a 4:3 ratio in mixed material, and a 5:2 within rock. Material to be excavated is estimated at 962 cubic yards. The project is located within a non-motorized wilderness designation within the Madison Mountain range approximately 22 miles northwest of West Yellowstone, MT. From West Yellowstone, follow north on highway 191 approximately 8 miles. Turn left or west on highway 287, and follow for approximately 14 miles to the Beaver Creek road, between Hebgen and Earthquake lakes. Turn right or north on Beaver Creek road #985, and follow for three miles to the West Fork Beaver Creek trailhead and beginning of project. MAGNITUDE OF ION (per FAR 36.204(b)): Between 250,000 and 500,000. BONDING: All offerors will be required to provide a Bid Bond (20) with their proposal submission. and Bonds (100 each) will be required of the successful awardee. There is no formal for this project. Vendors are strongly encouraged to visit the site prior to submitting their proposal. For site information, clarification on directions and site conditions (such as closures, snow levels, etc.) please contact Todd Orr, Engineer Tech, Custer Gallatin National Forest at 406-587-6741 (todd.orrusda.gov) during normal business hours. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$435,296.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2025
June 26, 2025
To Be Determined, Big Sky, MT
Related To This Project
Big Sky, MT
Bid Date: Aug 23 2024
Big Sky, MT
--
Big Sky, MT
Bid Date: Mar 28 2025
Big Sky, MT
Bid Date: Jan 13 2026
Big Sky, MT
--
Big Sky, MT
Bid Date: Jan 25 2024
Big Sky, MT
Bid Date: Nov 21 2023
Big Sky, MT
--
Big Sky, MT
Bid Date: Mar 08 2022
Big Sky, MT
Bid Date: Jun 30 2023
Big Sky, MT
Bid Date: Feb 13 2023
Big Sky, MT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
