BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2024 at 8:00 PM

Updated June 15, 2024

Renovation of a mixed-use development in Richmond, Rhode Island. Completed plans call for the renovation of a educational facility.

https://www.bostonglobe.com/2024/06/04/metro/rhode-islands-school-construction-boom/p1=BGSearch_Advanced_Results Rhode Island's school construction boom Jun 04, 2024 / By Dan McGowan It's only June, but Cranston voters will head to the polls today to consider a $40 million school construction bond ____________________________________ Reference Number 0000348424 The Chariho Regional School District is Requesting Proposals for the Career & Technical Center Roof Replacement Sections A & G Job Location Chariho Career & Technical Center 459 Switch Road, Wood River Junction, RI 02894 Bid Intent Optional Bid Intent Deadline 06/04/2024 02:59 PM EDT Question Deadline 05/24/2024 at 1:00 PM ET Questions are submitted online Yes. Participation Requirements - Minority Business Participation - Women-Owned Business Participation General Requirements - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Surety Bond 10 % Project Scope: The project is located at the Chariho main campus and is located at the Career and Technical Center. The existing building is presently located at 459 Switch Road in Wood River Junction, Rhode Island. The project consists of demolition and removal of an existing built-up asphaltic roof system and 2 to 3 inches of insulation. There is existing mechanical and electrical equipment on the roof that will need to be temporarily disconnected and temporarily stored while the roof is being replaced. After completion of the new roof the equipment is to be returned to new curbs and reconnected by the roofing contractor or subcontractor(s). The new roof system is to be EPDM rubber roofing membrane. There will be a vapor barrier, protection board, and approximately 6" of insulation throughout the roof. All existing rooftop equipment will be removed and replaced with new curbs provided by the roofing contractor. The contractor is to provide roof drains with new drain bodies connected to the existing interior drain lines. There is abatement of lead contaminated paint, ACM adhesives and interior leader insulation that will be removed by the abatement group. The contractor is to coordinate their demolition work with the abatement team so as not to affect the overall project schedule. The contractor will procure and hire the abatement group. The abatement testing and abatement plan have been completed by RI Analytical Laboratories.

Post-Bid

Educational

$300,000.00

Public - County

Renovation

8

9

2

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
580
Active Projects
216
Bidding Soon
4,144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

July 4, 2024

Project location map

459 Switch Rd, Richmond, RI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.