Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Northbrook, Illinois. Conceptual plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.
The roadways selected for the FY 2027/2028 asphalt street reconstruction and rehabilitation program are rated as poor or having many failures. Roadways rated as having many failures (2 on a scale of 5) have large potholes and signs of the base beginning to fail will become evident. Examples of these failures include alligator cracking and failure of the roadway surface. Roadways rated as having limited failures (3 on a scale of 5) exhibit signs of road surface cracking and have small potholes beginning to form. Examples of these failures include horizontal and longitudinal road surface cracking. The condition of the roads listed above is such that patching is no longer an option and asphalt rehabilitation and reconstruction is necessary. The roads selected for this year's program are based on staff and IMS ratings. Staff utilizes IMS, a pavement management system, to estimate costs for rehabilitation or reconstruction of each segment of asphalt street. IMS considers many variables, including square yards of pavement, when estimating costs; therefore, segments with similar yardage may have different cost estimates. This year's asphalt street reconstruction and rehabilitation project coincides with the water main replacement along these same streets. The project is include in the City's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$1,593,861.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 1, 2028
Multiple Locations, Northbrook, IL
Related To This Project
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
Bid Date: Jun 07 2024
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
Bid Date: Apr 30 2024
Northbrook, IL
Bid Date: Apr 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.