BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Northbrook, Illinois. Conceptual plans call for site work for a water / sewer project.

The Village of Northbrook plans for and funds the replacement of water main each year. A particular focus is placed on replacing 6-inch cast iron water mains as this is historically the worst performing classification of main within the water distribution system. The 1916 6-inch and 8-inch cast iron water mains on Walters Avenue between Shermer Road and Pfingsten Road have been scheduled for replacement due to their age and overall condition. Contractual topographic surveys will be conducted in FY 2024/2025, design and engineering will take place in FY 2025/2026 and FY 2026/2027 with construction planned for FY 2027/2028. The replacement of these water mains coincides with the road rehabilitation and bike and pedestrian improvements planned for FY 2027/2028. The project is include in the City's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$2,405,885.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
99
Bidding Soon
1,965
All Active Projects
844
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2028

img_map_placeholder

Walters Ave, Northbrook, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.