Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 12, 2025 at 8:00 PM
Updated May 13, 2025
Site work and paving for a sidewalk / parking lot in Northbrook, Illinois. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Update: The Village of Northbrook plans to resurface Walters Avenue in FY 2027 in conjunction with Surface Transportation Program (STP) grant funds the Village has received. As part of the planning for that work the water main on Walters Avenue has been identified for replacement and the Village's Master Bicycle and Pedestrian Plan (MBPP) identifies Walters Avenue for separated bike lanes. An initial review of the bike/pedestrian improvements was conducted and an open house was held in April 2023 for the Public. The PBC has recommended moving forward with Phase I preliminary engineering of conventional bike lanes along the corridor. Preliminary engineering is underway and will be completed in FY 2026 before a determination of what if any bike and pedestrian improvements are included in the final design and scope of the project. Project is included Village of Northbrook Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Village of Northbrook plans to resurface Walters Avenue in FY 2027/2028. As part of the Village's implementation of the Master Bicycle and Pedestrian Plan (MBPP), the Village seeks to implement bicycle facilities on Walters Avenue between Pfingsten Road and Shermer Road. The Pedestrian and Bicycle Commission (PBC) and Village staff engaged a consultant to explore bicycle and pedestrian improvement options along this corridor. An open house was held in April 2023 and feedback was provided. The PBC recommends moving forward with Phase I preliminary engineering of conventional bike lanes along the corridor. The Village will begin Phase 1 design engineering in FY 2024/2025 and complete design engineering in FY 2025/2026. If approved by the Village Board, Construction is scheduled for FY 2027/2028 to coincide with the Walters Avenue rehabilitation project. The project is include in the City's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Sidewalks / Parking Lot
$1,889,384.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 1, 2028
Walters Ave, Northbrook, IL
Related To This Project
Northbrook, IL
Bid Date: Jul 10 2024
Northbrook, IL
Bid Date: Mar 08 2019
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
Bid Date: Jul 17 2024
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
