BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2025 at 8:00 PM

Updated May 13, 2025

Site work for a water / sewer project in Northbrook, Illinois. Conceptual plans call for site work for a water / sewer project.

Update: Over the years the Village has worked to re-establish priorities for stormwater. In 2011, the Village developed a Master Stormwater Management Plan (MSMP) which identified areas in the Village where opportunities existing to improve storm systems in order to alleviate areas with significant flooding. The Village completed the third Addendum to the MSMP in 2023 which identified and recommended Project #37 where structure flooding occurred due to the poor condition of the existing storm sewer system on Koepke Road. Properties Impacted: This project will impact Koepke Road from Miller Road to Pfingsten Road. 2 properties will experience a reduction in property flooding. 1 property currently experiences structure flooding. Staff anticipates that this project will create a reduction in structure flooding for this property. Construction Timeframe: The engineering and design of this project will occur in FY 2026 and FY 2027 and construction of this project has been scheduled to be constructed concurrent to an asphalt rehabilitation project and bicycle and pedestrian improvements along the corridor in FY 2028. Project is included Village of Northbrook Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Over the years, the Village has worked to re-establish priorities for stormwater. In 2011, the Village developed a Master Stormwater Management Plan (MSMP) which identified areas in the Village with opportunities to improve storm systems in order to alleviate significant flooding. In 2023, the Village completed the third addendum to the MSMP which identified and recommended Project #37 where structure flooding occurrs due to the poor condition of the existing storm sewer system on Koepke Road. The engineering and design of this project will occur in FY 2024/2025 and FY 2025/2026 with construction of this project scheduled to be concurrent to the asphalt rehabilitation project and bicycle and pedestrian improvements along the corridor in FY 2026/2027. This project will impact Koepke Road from Miller Road to Pfingsten Road. Two properties will experience a reduction in property flooding. One property currently experiences structure flooding; staff anticipates that this project will reduce structure flooding for this property. The project is include in the City's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$1,099,008.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
515
Active Projects
287
Bidding Soon
3,683
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2029

Project location map

Koepke Rd, Northbrook, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.