Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 12, 2025 at 8:00 PM
Updated May 13, 2025
Site work for a water / sewer project in Northbrook, Illinois. Conceptual plans call for site work for a water / sewer project.
Update: Over the years the Village has worked to re-establish priorities for stormwater. In 2011, the Village developed a Master Stormwater Management Plan (MSMP) which identified areas in the Village where opportunities existing to improve storm systems in order to alleviate areas with significant flooding. The Village completed the third Addendum to the MSMP in 2023 which identified and recommended Project #37 where structure flooding occurred due to the poor condition of the existing storm sewer system on Koepke Road. Properties Impacted: This project will impact Koepke Road from Miller Road to Pfingsten Road. 2 properties will experience a reduction in property flooding. 1 property currently experiences structure flooding. Staff anticipates that this project will create a reduction in structure flooding for this property. Construction Timeframe: The engineering and design of this project will occur in FY 2026 and FY 2027 and construction of this project has been scheduled to be constructed concurrent to an asphalt rehabilitation project and bicycle and pedestrian improvements along the corridor in FY 2028. Project is included Village of Northbrook Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Over the years, the Village has worked to re-establish priorities for stormwater. In 2011, the Village developed a Master Stormwater Management Plan (MSMP) which identified areas in the Village with opportunities to improve storm systems in order to alleviate significant flooding. In 2023, the Village completed the third addendum to the MSMP which identified and recommended Project #37 where structure flooding occurrs due to the poor condition of the existing storm sewer system on Koepke Road. The engineering and design of this project will occur in FY 2024/2025 and FY 2025/2026 with construction of this project scheduled to be concurrent to the asphalt rehabilitation project and bicycle and pedestrian improvements along the corridor in FY 2026/2027. This project will impact Koepke Road from Miller Road to Pfingsten Road. Two properties will experience a reduction in property flooding. One property currently experiences structure flooding; staff anticipates that this project will reduce structure flooding for this property. The project is include in the City's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$1,099,008.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 1, 2029
Koepke Rd, Northbrook, IL
Related To This Project
Northbrook, IL
--
Northbrook, IL
Bid Date: Jul 10 2024
Northbrook, IL
Bid Date: Mar 08 2019
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
Bid Date: Jul 17 2024
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
--
Northbrook, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
