Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Saginaw, Michigan. Completed plans call for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
All interested contractors should contact Erica Meisel for bid details and documents ericameisel@spencebrothers.com White Pine Middle School Parking Lot Renovation Bid Package #1 The project will consist of Saginaw Township Community Schools, 2024 White Pine Parking Lot, Bid Pack #1. Construction will begin June 2024 and be completed in August 2024. No bids will be accepted at the office of the Owner, Construction Manager or the Architect. All bids received after the bid due time on the bid due date will not be accepted and will be returned to the Bidder. Bidder will be notified if their bid was received late. The Construction Manager is utilizing Procore's project management software as the repository for all bid documents, construction documents, and related correspondence for this project. This includes, but is not limited to, notices, drawings, specifications, project manuals, addenda, bid clarifications, etc. It is each bidder's responsibility to ensure they retrieve any and all bid documents issued for this project. All questions need to be submitted to the Construction Manager, Erica Meisel at Ericameisel@spencebrothers.com. All questions must be submitted in writing no later than May 29, 2024. No direct contact with the Owner, Architect, or consulting Engineers is permitted. All proposals submitted shall remain valid for a period of sixty (60) days after the bid date. The Owner, Architect, and Construction Manager reserve the right to accept and/or reject any or all bid proposals and to waive any and all informalities and/or irregularities in bid proposals submitted. This right shall be exercised at the sole discretion of Saginaw Township Community Schools. Spence Brothers will make awards as may appear to be in the best interest of Saginaw Township Community Schools. A Bid Security by a qualified surety authorized to do business in the State where the Project is located and in the amount of five percent (5%) of the Base Bid shall accompany each proposal or proposal combination. The Bid Security may be in the form of a Bid Bond, Cashier's Check, or Money Order. Personal checks are NOT acceptable. Bids may not be withdrawn for a period of sixty (60) days after the bid date. Bidders will be required to furnish the cost of Performance and Payment Bonds in the amount of 100% of their bid. The cost of the Bond shall be included on each proposal form separate from the base bid. The Construction Manager will direct, supervise, coordinate, and manage the project. Overall administration of the Project will be the responsibility of the Construction Manager, Spence Brothers. The Construction Manager will award contracts for separate bid divisions or combinations of bid divisions. All bids shall be submitted on the bid proposal forms provided in the Construction Manager's Project Manual, completely filled in, and executed.
Post-Bid
Sidewalks / Parking Lot
$200,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2024
July 8, 2024
505 N Center Rd, Saginaw, MI
Related To This Project
Saginaw, MI
Bid Date: May 31 2024
Saginaw, MI
Bid Date: Jun 11 2024
Saginaw, MI
Bid Date: May 31 2024
Saginaw, MI
Bid Date: May 31 2024
Saginaw, MI
Bid Date: Jun 26 2024
Saginaw, MI
--
Saginaw, MI
Bid Date: Jul 03 2024
Saginaw, MI
Bid Date: May 30 2024
Saginaw, MI
Bid Date: Jun 03 2024
Saginaw, MI
Bid Date: Jun 04 2024
Saginaw, MI
Bid Date: Jun 05 2024
Saginaw, MI
Bid Date: May 17 2024
Saginaw, MI
Bid Date: May 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.