Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 15, 2026 at 7:00 PM
Updated January 16, 2026
Site work for a water / sewer project in Herriman, Utah. Completed plans call for site work for a water / sewer project.
Rosecrest Pipeline Capacity Upgrades DESCRIPTION OF WORK: The work to be performed under this Contract consists of furnishing all facilities, tools, equipment, materials, supplies, and manufactured articles, and furnishing all labor, transportation, and services including fuel, power, water, essential communications, permits and performing all Work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The Work includes installation of a new 24” welded steel pipeline to parallel an existing line which will increase capacity and reliability to the existing system and assist the District in meeting future water demands. The work also includes various vaults, valves, and other appurtenances to help bring the new pipeline into full working order. SITE OF WORK: The project begins at 13400 South Rosecrest Road in Riverton, follows the alignment of the existing pipeline along Rosecrest Road in Herriman headed south, and ends at JVWCD’s reservoir site at 5601 West Emmaline Drive, Herriman via Crown Rose Drive. An Award of Contract, if it were awarded, will be made within 60 calendar days of the opening of bids. COMPLETION OF WORK: All work shall be completed within 825 calendar days from the date of the Notice to Proceed. Work shall be sequenced and scheduled as listed in Section 01 14 40 – Construction and Schedule Restraints. BID SECURITY: Each bid shall be accompanied by a certified or cashier’s check, money order or bid bond in the amount of five percent of the total bid price payable to the Jordan Valley Water Conservancy District as a guarantee that the bidder, if its bid is accepted, will promptly execute the contract, provide evidence of worker's compensation insurance, and furnish a satisfactory faithful performance bond in the amount of 100 percent of the total bid price and a payment bond in the amount of 100 percent of the total bid price. OWNER'S RIGHTS RESERVED: The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the Owner.
Award
Water / Sewer
$15,082,000.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2025
April 16, 2026
Rosecrest Dr, Herriman, UT
Related To This Project
Herriman, UT
Bid Date: Jun 26 2024
Herriman, UT
Bid Date: Jun 26 2024
Herriman, UT
Bid Date: Jul 16 2024
Herriman, UT
--
Herriman, UT
--
Herriman, UT
--
Herriman, UT
--
Herriman, UT
Bid Date: Sep 19 2024
Herriman, UT
Bid Date: May 28 2024
Herriman, UT
--
Herriman, UT
--
Herriman, UT
Bid Date: Apr 17 2024
Herriman, UT
Bid Date: Mar 11 2024
Herriman, UT
--
Herriman, UT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
