BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2024 at 8:00 PM

Updated June 28, 2024

Site work and paving for a sidewalk / parking lot in Northglenn, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000353099 Job Location: Irma Drive, Northglenn, CO Question Deadline 06/13/2024 at 5:00 PM MT Questions are submitted online No The City is soliciting the installation of two (2) pedestrian crossings, crossing Irma Drive between E. 112th Avenue and E. 104th Avenue. July Notice of Award The City reserves the right to reject any late submittals. TIME OF WORK A. The Contractor shall complete all work required by these specifications within (45) calendar days. The starting time for the Contract shall be ten (10) calendar days following the date of the Notice to Proceed. Working hours shall be 8:00 A.M. to 5:00 P.M. Monday through Friday. A working day shall be defined as any day, exclusive of Saturdays, Sundays and holidays, on which weather and other conditions not under the control of the Contractor will permit construction to proceed for a minimum of one half (1/2) of the day with a normal working force. See Trade Contractor Agreement. The Contractor shall be responsible for submitting a schedule for all work to be performed. This schedule shall be updated weekly and resubmitted to the Engineer for acceptance.

Post-Bid

Sidewalks / Parking Lot

$450,000.00

Public - City

Paving, Site Work

6

17

11

5

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
62
Bidding Soon
1,179
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

July 25, 2024

Project location map

Irma Dr, Northglenn, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.