BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Warrenville, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Approximately 16,500 square yards of asphalt resurfacing; asphalt pavement patching; sidewalk replacement; curb and gutter replacement; and all incidental and collateral work necessary to complete the project. All bids shall be made on the forms provided and will be made part of the contract documents to be executed with the Owner. Each bid shall be accompanied by a bid bond, bank draft, cashier's check or certified check payable to the order of the City of Warrenville, Illinois, in an amount not less than five (5) percent of the amount of the bid, as a guaranty that the bidder will execute the contract, if it is awarded, in conformity with the bid form. A current IDOT Certificate of Eligibility shall also be provided with each bid. The successful bidder will be required to furnish Performance and Payment Bonds on forms provided in the Specifications and Contract Documents, each in an amount equal to 100 percent of the contract price. The Owner expressly reserves the right to reject any or all bids or to accept the one that appears to be in the best interest of the Owner. The Owner expressly reserves the right to waive any informalities or technical irregularities in a bid if to do so is in the best interest of the Owner. Copies of Instructions for Bidders, Bid Form, Plans, and Specifications will be available for download in digital format (PDF) beginning May 23, 2024 from the BHFX online website at online. All Work (excluding Park District Work) cannot begin sooner than July 8, 2024. All Work (excluding Park District Work) must be completed October 31, 2024. Park District Work to be started after August 10, 2024, and completed before September 16, 2024.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

5

15

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
119
Bidding Soon
1,781
All Active Projects
794
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

July 8, 2024

img_map_placeholder

Multiple Locations, Warrenville, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.