BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Site work and new construction of a water / sewer project in Rifle, Colorado. Completed plans call for site work for a water / sewer project; and for the construction of a water / sewer project.

Reference Number 0000420965 Bid Intent Not Available The Work will include all necessary labor, supervision, equipment, tools and materials for the construction of a new Wastewater lift station located at the existing South Lift Station site. Work includes the construction of a 100,000 gallon buried concrete wetwell, installation of a new packaged lift station and enclosure, buried pipe modifications, and electrical upgrades at the site. Question Deadline 06/15/2026 at 12:00 PM MT Questions are submitted online No, Contact Iris Trevisano, itrevisano@rifleco.org , 970-665-6412 for questions or issues with downloading the documentation. All questions about the meaning or intent of the Contract Documents are to be directed to Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than five (5) days prior to the date of opening of Bids may not be answered. Anticipated Award Date: July 15th, 2026* Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % A Bid Bond in the amount of 5% of bid price is required, and a Performance and a Payment Bond, each in the amount of 100% of bid, will be required. Bid Award will be the July 15th, 2026* Council Meeting. Time of Commencement of the Work is anticipated to be no later than May 20, 2026 *, with completion of Concrete Structures and Backfill by December 2026 The Owner reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Contract and to complete the work contemplated therein. The Work will include all necessary labor, supervision, equipment, tools and materials for the construction of a new Wastewater lift station located at the existing South Lift Station site. Work includes the construction of a 100,000 gallon buried concrete wetwell, installation of a new packaged lift station and enclosure, buried pipe modifications, and electrical upgrades at the site.

GC Bidding

Water / Sewer

$500,000.00

Public - City

New Construction, Site Work

21

7

4

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
17
Bidding Soon
304
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

August 3, 2026

Project location map

187 Shotgun Dr, Rifle, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.