BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Shawnee, Oklahoma. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

K-7 and 75th is currently an at grade intersection that does not allow north-bound traffic movements on K-7 when coming from the west on 75th Street, or south-bound traffic movements on K-7 when coming from the east on 75th street. The current intersection configuration does not allow traffic to cross K-7 from the east or west. This project will require the acquisition of right of way necessary to create a grade separation for 75th Street to cross over K-7 with a bridge structure. A diverging diamond interchange is contemplated to maximize safety by eliminating conflict points while minimizing the required right of way required. The Capital Improvement Plan (CIP) for FY 2025-2029 was heard for the last time before being approved by the Board of Shawnee City Commission at a meeting held on Monday, June 17. Many projects that have been on citizens’ minds were addressed in the plan, and they are now on a timeline. The largest budgeted projects are set to begin under the FY 2025 budget. As of June 25, 2024, project is funded for construction starting January 1, 2027 and completed December 31, 2029. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$27,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
96
Bidding Soon
1,067
All Active Projects
516
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2027

img_map_placeholder

KS-7 & W 75th St, Shawnee, OK

Related To This Project


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.