Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Superior, Colorado. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; two-story above grade pre-engineered storage facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Reference Number 0000353615 Job Location: 1950 Honey Creek Lane, Superior, CO 80027 This RFQ is for a design/build contract for the design and construction of the Town of Superior's new O&M Facility. The Project consists of constructing a new Operations and Maintenance Facility for the Public Works & Utilities (PWU) and Parks, Recreation, & Open Space (PROS) departments in the Town of Superior. The site has a new address of 1950 Honey Creek Lane, Superior, CO 80027 and is located directly adjacent to the Town's Wastewater Treatment Plant (WWTP). The Operations and Maintenance Facility will have a new pre-engineered metal building with four (4) drive through bays and a two-story office and storage space. The facility will be connected to the WWTP so the existing fence will be removed and a new fence will be added around the new facility. Additional paving and parking space markings will be added to the site. Two existing buildings at the WWTP that are currently used for the PWU department will be renovated to be storage and shop space. The existing water quality pond south of the WWTP fence will need to be expanded. The enlarged water quality pond will likely a new or modified outfall to Rock Creek. This will coordination and approval from Mile High Flood District. Design for the new outfall channel may permitting from the Army Corps of Engineers. A preliminary design for the facility and building layout has been performed and is attached in Appendix A of this RFQ. This report includes a preliminary site plan, a preliminary building layout with elevations, a site and building narrative, and a proposed mechanical system narrative. A geotechnical report is being developed and will be made available in an addendum when it is complete. The site for this new facility is located in the Special Flood Hazard Area. A CLOMR-F from FEMA is required to obtain a building permit in the Town of Superior. Once the project is complete, a LOMR-F will need to be completed. The Town hopes to make this facility the Town's Emergency Operations Center. The Town has requested federal funding assistance in building this facility through the Congressional Directed Spending program. This funding is guaranteed but the Town would like to be prepared in case this funding is granted. All FEMA-funded non-critical actions in the 1% annual chance floodplains (also known as the 100-year floodplain) that involve new construction or substantial improvement of structures must be elevated, at a minimum, to the lower of: Two (2) feet above the 1% annual chance flood elevation (also known as the base flood elevation), in accordance with the Federal Flood Risk Management Standard (FFRMS) Freeboard Value Approach (FVA); or The 0.2% annual chance flood elevation. Where 0.2% annual chance flood elevations are available, such actions must be elevated to at least two feet above the 1% annual chance flood elevation. Question Deadline 06/26/2024 at 12:00 AM MT Questions are submitted online No, E-mail inquiries shall be sent to: christinek@superiorcolorado.gov and shall include the wording Superior O&M Facility Inquiry Request in the subject line. The design-build contract Guaranteed Maximum Price (GMP) for the Project is estimated to be $5 million. The anticipated completion deadline for the Project is October 1, 2026 or sooner. The Town reserves the right, in its sole discretion, to cancel this RFQ, issue a new RFQ, reject any or all SOQs, seek or obtain data from any source that has the potential to improve the understanding and evaluation of the responses to this RFQ, seek and receive clarifications to a SOQ and waive any deficiencies, irregularities, or technicalities in considering and evaluating the SOQs.
Post-Bid
Water / Sewer
$5,000,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2024
March 10, 2025
1950 Honey Creek Dr, Superior, CO
Related To This Project
Superior, CO
Bid Date: Jul 12 2024
Superior, CO
Bid Date: Jul 31 2024
Superior, CO
Bid Date: Jul 16 2024
Superior, CO
--
Superior, CO
Bid Date: Sep 06 2024
Superior, CO
Bid Date: Oct 21 2024
Superior, CO
Bid Date: Sep 13 2024
Superior, CO
Bid Date: May 30 2024
Superior, CO
Bid Date: May 01 2024
Superior, CO
--
Superior, CO
Bid Date: Apr 17 2024
Superior, CO
--
Superior, CO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.