BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2024 at 8:00 PM

Updated July 4, 2024

Site work for a civil project in Moon Twp, Pennsylvania. Completed plans call for site work for a road / highway; and water / sewer project.

Philomena Storm water Improvements (Phase 1). Scope of Work Generally Consists of the Construction of One Underground Storm water Detention Facility Including Excavation; Installation of Outlet Structures and Manhole; Installation of 15" Storm Sewers; Underdrains; Bituminous Roadway Restoration The Projects Are Being Funded in Part by a H20 Pa Grant From the Commonwealth Financing Authority. Biddei Must Agree to Comply With All Requirements Associated With the Loan/grant. Pennsylvania Prevailing Wage Rates Apply if Over $25,000.00. Proposals Must Be Upon the Forms Furnished by the Township. The Bid Must Be Accompanied by a Certified Check or Bid Bond in the Amount of Ten Percent (10%) of the Bid, Made Payable to the Township of Aaoon to Guarantee the Bidder's Entrance Into the Contract if Given the Award. Scope of Work Includes the Storm Sewer Improvements Near the Intersections of Lark Drive and Hassam Road Including Installation of New Storm Sewers; Underdrains; Storm Inlets and Manholes; Outlet Structure; Riprap; Roadway Restoration; Traffic Control; Two Add Alternates for Additional Storm Sewer, and All Necessary Appurtenances for Said Construction. Contract No. 23-sw3 2023 Storaawater Iaaproveaaents the Scope of Work Generally Consists of the Construction of One Underground Storm water Detention Facility Including Excavation; Construction of a New Stormwater Management Facility; Installation of Outlet Structures; Installation of New Storm Sewer Infrastructure; Roadway Restoration; and All Necessary Appurtenances and Restoration for Said Construction. The Township Reserves the Right to Reject Any or All Proposals and to Waive Any Informalities in the Bidding. No Bid May Be Withdrawn for Ninety (90) Calendar Days After the Scheduled Time for Receipt of Bids. Without intending to limit and/or restrict the volume of work required by this section of the Specifications and applicable drawings, the work generally consists of furnishing all labor, materials, equipment, transportation, services and appurtenances necessary to complete the following: A. The scope of work includes the storm sewer improvements near intersection of Stillwood Drive and Hassam Road including approximately 1,155 linear feet of new storm sewers; installation of 6 underdrains, 6 storm manholes, 10 inlets, 1 outlet structure, riprap, roadway restoration, traffic control, and all necessary appurtenances for said construction.

Bid Results

Roads / Highways

$600,000.00

Public - County

Site Work

21

8

42

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
123
Bidding Soon
2,063
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

July 25, 2024

Project location map

Lark Drive and Hassam Road, Moon Twp, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.