Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 12, 2025 at 8:00 PM
Updated March 14, 2025
Site work for a water / sewer project in Moon Twp, Pennsylvania. Completed plans call for site work for a water / sewer project.
The Project has an expected duration of ninety (90) days. The Project includes the following Work: Work under Contract 2024-01 covers the furnishing of all labor, material, plant, utilities, and services required for the installation of 8" and 6" waterline along Sharon Road. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Attention is called to the fact that prevailing minimum wage rates as determined by the Secretary of the Department of Labor and Industry must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each contractor is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012. Any and all steel products used or supplied in the performance of the contract or any subcontracts shall be from steel made in the United States. The Owner hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received. Except as otherwise provided by law, no bidder may withdraw its bid for sixty (60) days after the Bid Due Date, unless the contract award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case, the Bids shall remain open to acceptance and shall be irrevocable for a period of sixty (60) after the Bid Due Date. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered.
Post-Bid
Water / Sewer
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2025
April 14, 2025
Sharon Rd, Moon Twp, PA
Related To This Project
Moon Twp, PA
Bid Date: Nov 27 2024
Moon Twp, PA
--
Moon Twp, PA
Bid Date: Mar 11 2025
Moon Twp, PA
Bid Date: Mar 24 2025
Moon Twp, PA
Bid Date: Mar 25 2025
Moon Twp, PA
Bid Date: Mar 18 2025
Moon Twp, PA
Bid Date: Apr 07 2025
Moon Twp, PA
Bid Date: Aug 11 2025
Moon Twp, PA
Bid Date: Dec 12 2024
Moon Twp, PA
--
Moon Twp, PA
--
Moon Twp, PA
Bid Date: Aug 22 2024
Moon Twp, PA
Bid Date: Sep 03 2021
Moon Twp, PA
Bid Date: Jun 27 2024
Moon Twp, PA
Bid Date: Jun 25 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
