BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2024 at 8:00 PM

Updated June 27, 2024

Site work for a civil project in Alhambra, Alberta. Completed plans call for site work for a bridge / tunnel.

Work shall include the demolition, and supply and installation of a new bridge culvert structure over Horseguard Creek, located 3 km northwest of Alhambra (SE 18-39-5-W5M). The Contractor shall install the 5.23 m diameter SPCSP culvert by 42.67 m invert length as per the Design Drawings and Section 18 of the Standard Specifications for Bridge Construction. The culverts will be located on square to the local road, centred at Station 5+500.000. The Scope of the Work includes, but is not limited to, the following: - Traffic accommodation - Site isolation, turbidity monitoring, and fish & water accommodation - Demolition and disposal of bridge structures - Excavation, including supply & placement of geotextile filter fabric - Supply and assembly of culvert materials - Backfill, including backfill material testing - Concrete end treatment including concrete testing and small bridge plaque - Supply and installation of substrate holders including heavy rock riprap substrate - Heavy rock riprap erosion protection including geotextile filter fabric - Roadway work - Permanent environmental protection devices Documents can be obtained from https://buildworkscanada.com

Award

Bridges / Tunnels

$1,242,072.00

Public - County

Site Work

7

7

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
0
Bidding Soon
113
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

August 1, 2024

Project location map

SE 18-39-5-W5M, Alhambra, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.