EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 24, 2024 at 8:00 PM

Updated April 15, 2025

Renovation of an educational facility in Morgantown, West Virginia. Completed plans call for the renovation of a educational facility.

Renovations to the EQT Lab, Fluid Lab, and Core Lab located in the Mineral Resources Building. Work includes slight demolition, painting, flooring, new countertops, ceilings, and lights. West Virginia University on behalf of its Board of Governors ("BOG") located in Morgantown, West Virginia ("WVU" or "University") is initiating this Request for Bids ("RFB") from qualified, experienced, and licensed Contractors to renovate three lab spaces in the Mineral Resource Building ("MRB"). The EQT Lab, Fluid Lab, and Core Lab renovations will consist of the demolition and/or removal of existing ceiling panels, lights, diffusers, and cove base, installation of an American with Disabilities Act ("ADA") workstations, new flooring, painting, and other amenities. Cutoff for Questions: DATE: June 4, 2024 TIME: 12:00pm Questions MUST be submitted directly on the solicitation website on the Q&A Board. The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated below. The date of issuance of the West Virginia University's Notice to Proceed and/or Contact shall be used to calculate Substantial and Final Completion. Substantial Completion shall be December 13, 2024 Final Completion shall be December 30, 2024 The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated above. The date of issuance of the West Virginia University's Notice to Proceed or Executed Agreement shall be used to calculate Substantial and Final Completion of contract time stated in number of consecutive calendar days or established date. Time is of the essence. Liquidated Damages shall be Five Hundred Dollars ($500) per Calendar Day of delay in achieving Substantial Completion and Two Hundred and Fifty Dollars ($250) per Calendar Day of delay in achieving Final Completion.

Bid Results

Educational

$323,743.00

Public - State/Provincial

Renovation

47

9

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 08 - Openings

Division 08 - Openings

Roof Windows and Skylights, Glazing, Louvers and Vents
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, General Vehicles, Vans

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
67
Bidding Soon
784
All Active Projects
338
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2024

July 18, 2024

img_map_placeholder

401 Evansdale Dr, Morgantown, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.