Site work for a mixed-use development in Perry Point, Maryland. Completed plans call for site work for a water / sewer project.

36C24524Q0552, 512-24-4-444-0163, 512A5-24-009 SCOPE OF WORK PROJECT DATA: TITLE: Deaeration Tank Replacement PROJECT No: 512A5-24-009 FACILITY: Perry Point VA Campus COR: Matt Hargrove P.E., Facilities & Engineering DURATION: 120 days GENERAL SCOPE: The Contractor shall provide all supervision, labor, materials and equipment to remove and replace the existing deaeration tank in kind. Provide deaeration (DA) tank capable of producing 70,000 lb/hr of de-oxygenated feedwater at 7-9 psi saturated steam pressure. Connections to existing piping shall be made at the nearest available flanged connection, reconfiguration of piping to accommodate new tank system is permissible with approved shop drawing. Remove existing cast iron DA tank feedwater piping and replace with forged steel fittings and cast steel valves. 2.5 and above, welded or flanged. 2 and below threaded sch 80. During demolition segregate waste streams, all recyclable materials shall be recycled to the extend practical. Provide waste manifest tickets for waste to landfill and recycled waste. Match construction and certification of tank in every aspect. The construction certification report has been provided for bidder s information. Include optional pricing for Belzona or approved equal lining Provide U-1A Manufacturers Data Report for Pressure Vessels Replace existing safety devices matching existing. Rebuild and recertify existing safety valves and return to the VA. Provide third party insurance inspection of installed tank with field inspection report and certification to operate. A rental deareation tank is in place currently, the new replacement tank must be online and fully operational by October 9th, 2024 or a temporary deaeration tank must be provided until the stationary replacement is complete. The temporary tank must be capable of providing 40,000 lb/hr deaerated water with 100% soft water make-up. The tank and pump set-up must deliver feedwater at all flow rates at 230 psi.

Post-Bid

Water / Sewer

$250,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
281
Active Projects
96
Bidding Soon
2,649
All Active Projects
1,141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2024

August 14, 2024

img_map_placeholder

361 Boiler House Rd, Perry Point, MD

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.