Site work for a mixed-use development in Perry Point, Maryland. Completed plans call for site work for a water / sewer project.
36C24524Q0552, 512-24-4-444-0163, 512A5-24-009 SCOPE OF WORK PROJECT DATA: TITLE: Deaeration Tank Replacement PROJECT No: 512A5-24-009 FACILITY: Perry Point VA Campus COR: Matt Hargrove P.E., Facilities & Engineering DURATION: 120 days GENERAL SCOPE: The Contractor shall provide all supervision, labor, materials and equipment to remove and replace the existing deaeration tank in kind. Provide deaeration (DA) tank capable of producing 70,000 lb/hr of de-oxygenated feedwater at 7-9 psi saturated steam pressure. Connections to existing piping shall be made at the nearest available flanged connection, reconfiguration of piping to accommodate new tank system is permissible with approved shop drawing. Remove existing cast iron DA tank feedwater piping and replace with forged steel fittings and cast steel valves. 2.5 and above, welded or flanged. 2 and below threaded sch 80. During demolition segregate waste streams, all recyclable materials shall be recycled to the extend practical. Provide waste manifest tickets for waste to landfill and recycled waste. Match construction and certification of tank in every aspect. The construction certification report has been provided for bidder s information. Include optional pricing for Belzona or approved equal lining Provide U-1A Manufacturers Data Report for Pressure Vessels Replace existing safety devices matching existing. Rebuild and recertify existing safety valves and return to the VA. Provide third party insurance inspection of installed tank with field inspection report and certification to operate. A rental deareation tank is in place currently, the new replacement tank must be online and fully operational by October 9th, 2024 or a temporary deaeration tank must be provided until the stationary replacement is complete. The temporary tank must be capable of providing 40,000 lb/hr deaerated water with 100% soft water make-up. The tank and pump set-up must deliver feedwater at all flow rates at 230 psi.
Post-Bid
Water / Sewer
$250,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2024
August 14, 2024
361 Boiler House Rd, Perry Point, MD
Related To This Project
Perry Point, MD
Bid Date: Oct 30 2024
Perry Point, MD
Bid Date: Nov 06 2024
Perry Point, MD
--
Perry Point, MD
Bid Date: Oct 16 2023
Perry Point, MD
--
Perry Point, MD
Bid Date: Aug 28 2023
Perry Point, MD
--
Perry Point, MD
--
Perry Point, MD
--
Perry Point, MD
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.