BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Binghamton, New York. Completed plans call for the demolition of a residential development; and for site work for a residential development.

4C08 Bathroom Demo Address: 249 Glenwood Rd Binghamton, NY 13905 4C08 Demolition, Plumbing, and rough framing. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to this scope of work and architectural drawings if supplied. Upon completion of 4C08 Demolition, Plumbing, and rough framing, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with the Maintenance Supervisor. 1. Perform demolition work, rough plumbing work, and install all rough framing. Per attached drawings pertaining only to 4C08 for this project. 2. The demolition & rough plumbing must include a separate line item to have this work completed after normal business hours (after 5pm or on weekend days). 3. Remove existing tile flooring. Coordinate with new Plumbing plan for extents. Remove existing floor drain(s) in its entirety. Coordinate with new plumbing plan. 4. Remove existing tile from the wall in its entirety. Coordinate with new work drawings for extents. 5. Remove existing casework in its entirety. 6. Remove existing plumbing fixtures in its entirety. Coordinate with new Plumbing plan. 7. Rough Plumbing must be correct to match new plumbing fixture requirements and new wall construction. 8. Existing vent piping must be able to be reconnected in a way that makes sense for the new piping configuration. No vent shall be disconnected and left "open", install a temporary cap, or plug until it is reconnected. 9. Sewer & drain piping shall be properly plumbed and kept free of construction debris at all times. Please install temporary plugs in any open sewer or drain piping. 10. Floors should generally pitch towards the floor drain when completed and be free of pooling. Make sure floor drains are not situated where the new partitions will mount. 11. Floor drain covers should be square. 12. Rough Framing shall be in accordance with the attached Stamped Drawings. 13. Metal Framing members must be 16ga. Minimum thickness. 14. Contractor shall warrantee work for a period of one year from date of payment for job. Warrantee shall be for parts and labor. 15. Do not tie new sewer & drain piping into the roof drain systems. 16. Work shall conform to all applicable codes, be done according to manufacturer's instructions, and follow industry best practices. Method of Award: This is an RFQ (request for quotes). This is not an IFB (bid). The Broome DDSO intends to award the contract to the most responsible and responsive vendor that provides the lowest cost and meets the requirements detailed in the scope of work. Upon request, vendor must demonstrate 2 years of relevant experience on prior projects of similar magnitude and its subject to vendor responsibility determination. Broome DDSO reserves the right to reject all quotes. In deciding whether to submit a quote, please be aware the awarded vendor must adhere to the time frames outlined in the scope of work. The awarded vendor will also be required to submit certificates of Liability Insurance and Worker's Compensation Insurance as well as completed Lobbying Law Forms, and signed Appendix A. Please be prepared to submit these in a timely fashion. The Broome DDSO will make no concessions to the vendor for any alleged misunderstanding or deception because of quantity, quality, character, or other condition. The Broome DDSO's interpretation of specifications shall be final and binding. Please note, all staff working at the project site will be required to sign an attendance sheet for record purposes. This includes the residence visitor log and/or an attendance sheet provided by the Maintenance Department. In the event of a tie, contract will be awarded to the Contractor whose bid was received earliest. Contract term: Within 60 days of receiving the purchase order. NYS Labor law requires that all contracted employees performing maintenance, repairs or capital improvements in state owned buildings receive the prevailing wage and supplements rate for the occupation in which they are working. Certified payroll record/s MUST be submitted at the time of invoicing. This is a NYS Public Works Project and Prevailing Wages MUST be paid.

Bid Results

Residential Subdivision

$13,000.00

Public - State/Provincial

Demolition, Site Work

10

3

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
83
Bidding Soon
823
All Active Projects
411
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

July 15, 2024

img_map_placeholder

249 Glenwood Rd, Binghamton, NY

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.