BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2024 at 8:00 PM

Updated August 31, 2024

Site work, paving and new construction of a bridge / tunnel in Delaney, Missouri. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The proposed work includes the removal of the existing bridge and construction of an 80 feet long x 24.5 feet wide steel girder bridge with a concrete deck, w-beam rails, reinforced concrete abutments, galvanized HP 12x53 piles, and other required appurtenances. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2019 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. The right is reserved to reject any or all bids. A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The DBE goal for this project is 5%. The Contract, if awarded, will be awarded to the lowest responsive, responsible bidder who provides the lowest price complying with the Conditions of the Contract Documents within the Owners budget MODOT - Constructing Bridge No. 35100022 Project Description: Section 22/27, T56N, R33W, 39.6455177-94.593372, Jenkins Branch, Clinton County Solicitation Number - 35100022, 23H3526 If you have questions please contact the SHPO at (573)751-7858 or call/email Jeffrey Alvey, (573) 751­ 7862, jeffrey.alvey@dnr.mo.gov. If additional information is required please submit the information via email to MOSectionlQ6 g dnr.mo.gov. The DBE goal for this project is 5%. Ifyou have questions please contact the SHPO at (573)751-7858 or call/email Jeffrey Alvey, (573) 751­ 7862, jeffrey.alvey@dnr.mo.gov. If additional information is required please submit the information via email to MOSectionlQ6 g dnr.mo.gov.

Award

Bridges / Tunnels

$542,134.00

Public - County

New Construction, Paving, Site Work

25

10

2

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
93
Bidding Soon
1,200
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

August 26, 2024

Project location map

Multiple Locations, Delaney, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.