BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a civil project in Goleta, California. Completed plans call for site work for a road / highway; and water / sewer project.

Furnishing all labor, materials, tools, and equipment necessary for installation of an irrigation mainline across 60 acres of Ellwood Mesa/Sperling Preserve Open Space; setup and maintenance of traffic control and trail detour systems; placement of crushed aggregate base; and clean-up of project area; and other related work as necessary to provide a complete project; all in accordance with the Standard Specifications, General Provisions, plans, and these Special Provisions Bid must be accompanied by a bid security in the form of a money order, a certified cashier's check, or bidder's bond executed by an admitted surety, made payable to CITY. The bid security shall be an amount equal to ten percent (10%) of the total annual bid amount included with their proposals as required by California law. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond each in an amount equal to 100% of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. Online Q&A Yes Q&A Deadline 08/19/2024 5:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% The project is tentatively scheduled to go to City Council for award of contract on September 17, 2024. Notice to Proceed is planned to be issued on September 23, 2024. Contractor shall complete all work and be demobilized from the site by Monday November 22, 2024. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated Bid Value $480,000 to $580,000 Project Duration 45 working days

Bid Results

Roads / Highways

$464,160.00

Public - City

Site Work

13

12

14

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
22
Bidding Soon
357
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2024

September 23, 2024

img_map_placeholder

7729 Hollister Ave, Goleta, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.