Site work and new construction of a municipal facility in Mount Joy, Pennsylvania. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

*As of January 13, 2025 this project has been awarded to multiple contractors for a total of $8,703,950.* New Municipal Building Separate, sealed Bids will be received for the following Prime Contracts: 3271-1 General Construction 3271-2 Heating, Ventilating and Air Conditioning Construction 3271-3 Plumbing Construction 3271-4 Electrical Construction Bidding document questions shall be directed to Crabtree, Rohrbaugh & Associates, Attention: Bidding Department, email: bidding@cra-architects.com. All questions pertaining to the Contract Documents, technical sections, legal documents, and bid submission shall be directed in writing to: Joseph Crabtree, Project Manager, email: jcrabtree@cra-architects.com. Each bid shall be accompanied by bid security in an amount equal to ten percent (10%) of the Base Bid amount and all alternate bid amounts in the form of a Bid Bond as described in the Supplementary Instructions to Bidders. A Performance Bond and a Payment Bond in the forms provided in the Project Manual, each in an amount equal to one hundred percent (100%) of the amount of the Contract, and each with satisfactory corporate surety, must be furnished by the successful Bidder prior to execution of a Contract. Bidders must comply with all State antibid-rigging regulations pertaining to work associated with this project and are required to submit an executed non-collusion affidavit with the bid. Owner shall award the Contract to the lowest responsive and responsible Bidder or shall reject all Bids within sixty (60) days of the date of the bid opening, and no Bidder may withdraw his Bid before the expiration of such sixty (60) day period; provided, however, if the award of contracts is delayed by required approval of another government agency, the sale of bonds or the award of a grant or grants, the Owner shall reject all bids or award the Contract to the lowest responsive and responsible Bidder within one hundred twenty (120) days of the date of Bid opening, and in such event no Bidder may withdraw his Bid before the expiration of such one hundred twenty (120) day period. Extensions of the date for the award of the Contract may be made by the mutual written consent of the Owner and the lowest responsive and responsible Bidder. The Borough of Mount Joy reserves the right in its sole discretion to reject any or all Bids and to waive irregularities in any Bid. Further, The Borough of Mount Joy reserves the right to award any combination of Alternates, or no Alternates, which in its sole discretion, serves the best interests of the Borough. Bid Result. General Construction: ECI Construction $5,685,500 HVAC Construction: Mid-State Mechanical $994,500 Plumbing Construction: Garden Spot Mechanical $679,500 Electric Construction: H B Frazer Company $1,363,950

Award

Municipal

$8,703,950.00

Public - City

New Construction, Site Work

110

34

29

4

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Manufacturer?s Field Services, Mockups, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Operation Data, Maintenance Data, Bonds, Warranties, Spare Parts, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Shop-Fabricated Structural Wood, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Metal Wall Panels, Composite Wall Panels, Flashing and Sheet Metal, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Specialty Ceilings, Linear Metal Ceilings, Flooring, Resilient Flooring, Resilient Base and Accessories, Carpeting, Wall Finishes, Special Wall Surfacing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Storage Assemblies, Exterior Specialties, Protective Covers, Flagpoles, Other Specialties, Pest Control Devices
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Educational and Scientific Equipment, Audio-Video Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment, Other Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Bedroom Furnishings, Pillows, Rugs and Mats, Furniture, Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Controls
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, Facility Fuel Systems, Facility Fuel Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Duct Silencers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Low-Voltage Controllers, Enclosed Controllers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Hooks, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
130
Bidding Soon
2,086
All Active Projects
932
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

January 15, 2025

img_map_placeholder

300 Orchard Rd, Mount Joy, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Mount Joy New Municipal Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.