Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 28, 2024 at 8:00 PM
Updated June 1, 2024
Site work and renovation of a mixed-use development in Lamar, Missouri. Conceptual plans call for the renovation of a 1,165-square-foot swimming pool; and for site work for a 8,284-square-foot swimming pool.
The City of Lamar Missouri is seeking a qualified Pool Design/Engineering Firm to plan and manage a project for the renovation of the existing Aquatic Center located at the Lamar City Park, 1901 Walnut. Historical Data The Aquatic Center originally opened in 1996 and consists of three pool structures and a bathhouse. The indoor lap pool is 1165 s.f. covered by a 34'x106' Kalwall Skylight. The pool operates independently on a segregated treatment and piping system. The outdoor Leisure pool is 5054 s.f. it has zero entry points, water features and a slide. The outdoor lap pool is 3230 s.f and consists of six swim lanes. The two outdoor pools share some lines and treatment through the pumphouse and balance tank. The bathhouse contains a men's and women's locker and shower rooms, reception area, guard offices, concession stand, and filter/treatment room. The facility has been closed since March of 2022 due to catastrophic concerns, primarily with the leisure pool. The leisure pool was losing massive amounts of water. The outdoor lap pool was also leaking along the southwest corner. In 2016 a French drain was installed to help the saturated hillside south of the pool. The leisure pool was closed in 2018 while some below grade piping was repaired and re-opened in 2020. At the time of the facility closing in 2022 the indoor pool was also losing water at a rate of 3-4" per day. In the summer of 2021, an evaluation was conducted by Waters Edge Aquatic Design that outlined some issues. Project Scope The City of Lamar is seeking qualifications from qualified firms to include, but not limited to removal of the leisure pool and bringing the outdoor and indoor lap pools back into operational status. Likely repairs may include repairing pool structures, removing lights in the pools, repairing below grade piping, altering and replacing any filtration, treatment, and electrical controls and components. The work will also include updates to the bath house to address structural issues, updating to modern code compliance and regulations, plumbing, air conditioning/heating, painting, and repairs to the locker rooms. The scope of work would also include the Natatorium, removal of the panels from the skylight and side walls. Evaluation would need to be conducted to evaluate the integrity of the natatorium structure and considerations of a screening material reapplied. The city will select the most qualified respondent. Questions about the quote can be directed to Rusty Rives at rrives@lamarmo.org or by calling 417.682.5554 x 2314 Engineering firms' name and address must be identified on the outside of the envelope. Electronic submissions are NOT allowed and will not be accepted. The City reserves the right to amend the RFQ based on questions and issues raised during the conduct of this solicitation. The method of Contractor Selection has not been Determined at this time.
Conceptual
Swimming Pools
$400,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2025
1903 Walnut St, Lamar, MO
Related To This Project
Lamar, MO
Bid Date: Jul 18 2024
Lamar, MO
Bid Date: Aug 08 2024
Lamar, MO
Bid Date: Jul 18 2024
Lamar, MO
--
Lamar, MO
Bid Date: Sep 19 2024
Lamar, MO
Bid Date: Oct 03 2024
Lamar, MO
Bid Date: Oct 31 2024
Lamar, MO
--
Lamar, MO
Bid Date: May 30 2024
Lamar, MO
Bid Date: Jan 22 2021
Lamar, MO
Bid Date: Apr 03 2024
Lamar, MO
Bid Date: Mar 25 2024
Lamar, MO
Bid Date: Mar 18 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
