BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2024 at 8:00 PM

Updated August 14, 2024

Site work and new construction of a mixed-use development in Ashburn, Missouri. Completed plans call for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; and water / sewer project.

As of August 13, 2024 project was awarded to Bleigh Construction, awarded amount is $312,651.93. The Work of the contract consists of one (1) project site and includes all labor, equipment, materials, site preparation, construction, design, fabrication, delivery, and installation of chemical storage building, hazardous material storage building, combination fill station hydrant system, water utilities, and electrical utilities as defined by the contract documents, under a single prime contract. Location Details Site Address: 3643 Pike 145 City: Ashburn County: Pike State/Province: MO Est. Value Notes: Range: $200,000 - $300,000 Contractors must be a plan holder of record to submit a bid for this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$312,652.00

Public - State/Provincial

New Construction, Site Work

14

17

2

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
1
Bidding Soon
993
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

July 29, 2024

Project location map

3643 Pike 145, Ashburn, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.