BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Saint Paul, Minnesota. Completed plans call for site work for a transportation facility.

Airport Location: Minneapolis-St. Paul International Airport This project provides for: Variable message sign replacement at Terminal 1 and Terminal 2. This work includes maintenance of traffic and traffic control, removals, canopy modifications, electrical, telecommunications and conduit modifications, installation of ground mounted and overhead variable message signs. Consistent with Minnesota Statute, Section 473.144, MAC may not accept a bid or proposal for a contract or execute a contract in excess of $100,000 with any business unless said business is in compliance with certain requirements concerning affirmative action plans. Evidence of compliance must be submitted within (1) one MAC business day following opening of bids. Bids will be considered non-responsive if the compliance requirements are not met. Compliance requirements are outlined in the project specification. Each bid shall be accompanied by a "Bid Security" in the form of a certified check made payable to the MAC in the amount of not less than five percent (5%) of the total bid, or a surety bond in the same amount, running to the MAC, with the surety company thereon duly authorized to do business in the State of Minnesota. Such Bid Security to be a guarantee that the bidder will not, without the consent of the MAC, withdraw its bid for a period of (70) days after the opening of bids, and, if awarded the Contract, will enter into a contract with the MAC, and in connection therewith, give Performance and Payment Bonds as required by law and on forms furnished to the Contractor by the MAC. In the event the Bidder fails to enter into a Contract, the amount of the certified check will be retained or the bond enforced by the MAC. The Bid Security of the three (3) lowest bidders will be retained until the contract is executed, but in no event longer than (70) days. The Bid Security of the lowest responsible bidder shall be retained in any event until the contract is executed and Payment and Performance Bonds furnished as herein provided The bid of the lowest responsible bidder, provided said low bidder has made a good faith effort to meet the TGB contract goal, will be accepted on or before the expiration of (70) days after the date of the opening of bids. The MAC, however, reserves the right to reject any or all bids and to waive any minor irregularities, informalities or discrepancies. Bid documents for this project may be viewed for no cost Online. For this project, bids will only be received electronically. Contractors submitting an electronic bid will be charged an additional $42.00, or other fee as determined by online, at the time of bid submission via the online electronic bid service.

Bid Results

Transportation Terminals

$1,843,600.00

Public - State/Provincial

Site Work

44

15

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
47
Bidding Soon
790
All Active Projects
340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

August 5, 2024

img_map_placeholder

4300 Glumack Dr, Saint Paul, MN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.