Site work for a transportation facility in Saint Paul, Minnesota. Completed plans call for site work for a transportation facility.

Airport Location: Minneapolis-St. Paul International Airport This project provides for: Variable message sign replacement at Terminal 1 and Terminal 2. This work includes maintenance of traffic and traffic control, removals, canopy modifications, electrical, telecommunications and conduit modifications, installation of ground mounted and overhead variable message signs. Consistent with Minnesota Statute, Section 473.144, MAC may not accept a bid or proposal for a contract or execute a contract in excess of $100,000 with any business unless said business is in compliance with certain requirements concerning affirmative action plans. Evidence of compliance must be submitted within (1) one MAC business day following opening of bids. Bids will be considered non-responsive if the compliance requirements are not met. Compliance requirements are outlined in the project specification. Each bid shall be accompanied by a "Bid Security" in the form of a certified check made payable to the MAC in the amount of not less than five percent (5%) of the total bid, or a surety bond in the same amount, running to the MAC, with the surety company thereon duly authorized to do business in the State of Minnesota. Such Bid Security to be a guarantee that the bidder will not, without the consent of the MAC, withdraw its bid for a period of (70) days after the opening of bids, and, if awarded the Contract, will enter into a contract with the MAC, and in connection therewith, give Performance and Payment Bonds as required by law and on forms furnished to the Contractor by the MAC. In the event the Bidder fails to enter into a Contract, the amount of the certified check will be retained or the bond enforced by the MAC. The Bid Security of the three (3) lowest bidders will be retained until the contract is executed, but in no event longer than (70) days. The Bid Security of the lowest responsible bidder shall be retained in any event until the contract is executed and Payment and Performance Bonds furnished as herein provided The bid of the lowest responsible bidder, provided said low bidder has made a good faith effort to meet the TGB contract goal, will be accepted on or before the expiration of (70) days after the date of the opening of bids. The MAC, however, reserves the right to reject any or all bids and to waive any minor irregularities, informalities or discrepancies. Bid documents for this project may be viewed for no cost Online. For this project, bids will only be received electronically. Contractors submitting an electronic bid will be charged an additional $42.00, or other fee as determined by online, at the time of bid submission via the online electronic bid service.

Bid Results

Transportation Terminals

$1,843,600.00

Public - State/Provincial

Site Work

44

15

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Aids, Vehicular Access and Parking, Haul Routes, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Traffic Signage, Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Other Conveying Equipment, Facility Chutes
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Panelboards, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
86
Bidding Soon
1,035
All Active Projects
462
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

August 5, 2024

img_map_placeholder

4300 Glumack Dr, Saint Paul, MN


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2024 Variable Message Signs Replacement P3

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.