BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2024 at 8:00 PM

Updated August 9, 2024

Site work and new construction of a pre-engineered storage facility in North Augusta, South Carolina. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Award: Kenrick Construction Company for $1,647,480.78 https://www.postandcourier.com/northaugusta/government/north-augusta-council-contract-waste-transfer-station-construction/article_d18cbde0-3884-11ef-bd19-37d8dfd3be28.html A North Augusta company has secured a $1.8 million contract for building the city’s regional solid waste transfer station. Kenrick’s Construction was the lowest of three bids received; North Augusta City Council authorized the contract July 1. The transfer station is one of the projects legislated for use of federal dollars that North Augusta received in South Carolina’s 2020 settlement with the U.S. Department of Energy over the long-term storage of weapons-grade plutonium at Savannah River Site. The city received $37 million from that settlement, which distributed some $525 million to the affected jurisdictions. Of North Augusta’s share, $2 million is for the transfer station. Trash collected throughout North Augusta will be brought to the transfer station, to go up on Clay Pit Road near the new recycling facility. It then will be mechanically scooped onto a boom truck and taken to the landfill. _________________ North Augusta Solid Waste Transfer Station. The City of North Augusta will receive sealed bids for construction activities related to a new solid waste transfer station at 2 PM on June 25. The work consists of site development, construction, and associated infrastructure for a Class 2 and Class 3 solid waste transfer station. The construction will include tipping floors, truck wells, and a pre-engineered metal building. Every request for such interpretation shall be submitted electronically to Thomas G. Jordan tjordan@davisfloyd.com Project Location: North Augusta, South Carolina

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$1,647,481.00

Public - City

New Construction, Site Work

27

14

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
69
Bidding Soon
812
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

July 25, 2024

Project location map

To Be Determined, North Augusta, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.