Published July 16, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in North Augusta, South Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

ADA compliant sidewalk needs to be added to stadium access for the newly renovated football facility. Additionally, handicap parking will need to be added behind the field with an access sidewalk. Three light posts will need to be added to the sidewalk to the field, there is an additional allocation of funds for the lighting, not to exceed 25,000. Construction Cost Range: 45,000 - 75,000 Project Location: 165 Shortcut Rd North Augusta, SC 29860 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 06/24/2024 at 2:00 PM ET Any questions relating to this proposal must be submitted in writing to jtrahan@fchs.net Scope of Work: There will be some minor demolition of an existing 80' sidewalk. Site preparation will need to ensure proper elevations are addressed before the new sidewalk is added. Minor site preparation for the handicap spaces and side walk behind the field. Electrical wiring and installation of posts for lighting over the ADA ramp.

Award

Sidewalks / Parking Lot

$64,900.00

Public - City

Paving, Site Work

8

4

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
39
Bidding Soon
421
All Active Projects
207
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

July 26, 2024

img_map_placeholder

165 Shortcut Rd, North Augusta, SC

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.