Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 1, 2024 at 8:00 PM

Updated July 2, 2024

Site work and paving for a road / highway in Pardeeville, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

1. West Bush Rd (Co G to Township Line) 2. Wardle Rd (W Bush Rd to Co P) 3. Jeri Dr (Wardle Rd to End) 4. Kristen Dr (Blank Rd to Ashley Dr) 5. Ashley Dr (Kristen Dr to Karamarie Dr) 6. Karamarie Dr (Ashley Dr to Blank Rd) 7. Wind Mariah Way (Kristen Dr to Karamarie Dr) 8. Wolfgram Rd (Co P to Jonathan Dr) 9. Parker Dr (Wolfgram Rd to Brody Dr) 10. Branden Rd (Parker Dr to End) 11. Brody Dr (Parker Dr to Payton Dr) 12. Payton Dr (Brody Dr to End) 13. Bobbi Rd (Payton Dr to Gravel) 14. Hunter Dr (Payton Dr to Co P) Details & Requirements: Emulsified Liquid Asphalt blended at a State of Wisconsin and AASHTO certified liquid asphalt production facility - FA-2 UTLEY or PORTAGE ASH FA-2, furnished, heated to 180 degrees F, and applied in a single pass up to 24 feet wide, and compacted using a rubber tire and/or combination rubber tire/steel wheel self-propelled roller. Excess cover aggregate to be removed per Owner's specifications. Bids should include personnel and equipment to sign work zone and thoroughly clean existing pavement with a combination self-propelled power broom /mechanical blower prior to chip seal surfacing. The selected Contractor must furnish a Certificate of Liability Insurance. The roads need to be completed by September 15, 2024. For any questions regarding this project, please contact Supervisor Craig Cawley at (608) 697-4851. The Town of Pacific reserves the right to reject any or all bids, reserves the right to accept any bid most advantageous, or waive any technicality.

Award

Roads / Highways

$800,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
74
Bidding Soon
1,891
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

July 11, 2024

Project location map

Multiple Locations, Pardeeville, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed