BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Camas, Washington. Completed plans call for site work for a municipal facility.

Chelan County Natural Resources requests sealed Bid Proposals in accordance with the "Instruction to Bidders" as contained in the Bid Documents for the Lower Camas Meadows Restoration Project located in Chelan County, Washington. Estimated range of probable cost for this project is $549,600 to $607,400 (without WA sales tax). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Chelan County Natural Resources Project: Lower Camas Meadows Restoration Project, Chelan County, WA. This contract provides for the removal of a 92" pipe arch culvert and installation of a 15'9" Span by 8' rise aluminum box culvert on Camas Creek. Channel grade control structures and a series of Engineered Log Jams (ELJ's) will also be installed throughout the project area. This work includes, but is not limited to installation, maintenance and restoration of temporary construction access routes and staging areas; road closures and temporary traffic control as needed to safely deliver, handle, and stage equipment and materials as well as safely direct traffic around the project area; structure, channel, and roadway excavation; roadway grading and paving; temporary erosion and sediment control; design, procurement, and installation of the new road crossing structure; procurement, handling and installation of large wood within Camas Creek; protection of sensitive areas; construction surveying required to perform the aforementioned tasks; and all other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the WSDOT Standard Specifications for Road, Bridge and Municipal Construction and addenda thereto. All questions during the bid process should be submitted to both Hannah and Bryan.

Bid Results

Municipal

$607,400.00

Public - County

Site Work

24

5

28

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
26
Bidding Soon
571
All Active Projects
281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2024

September 3, 2024

img_map_placeholder

Multiple Locations, Camas, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.