BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a fire / police facility in Desert Center, California. Completed plans call for the construction of a 9,144-square-foot fire / police facility; and for site work for a fire / police facility.

As of 06/25/2024: The Bid Period is being extended due to the need to change the design of the Fire Station to a one-hour, fire-rated structure (Type 5-A per 2019 CBC Table 601) because of limited water-pressure for the fire protection systems. We anticipate issuing revised drawings on 7/30/24 as Addendum #4, which will also establish: • Bid Deadline • RFI/Substitution Deadline New construction of a single story 9,144 sf fire station with three drive through apparatus bays, lobby, storage rooms, kitchen, dining, day room, 3 restrooms, 6 dorm rooms and a gym. To include site improvements on an undeveloped site of 55,000 sf. SCOPE OF WORK SUMMARY A. Furnish all labor and equipment necessary to perform demolition and site clearing work as shown on drawings and specified herein, including removal of slabs, curbs, walls, partitions, fixtures, finishes, and other items as indicated and required for new construction. B. Protect all existing installations from damage. Take measures to prevent damage to existing facilities and finishes during demolition and construction. C. Carefully remove items which are to remain property of Owner, and store in secure, dry area for later reuse. D. Salvaged Material (not wanted by Owner): Items which the Owner does not want and is of salvable value to Contractor may be removed from structure as work progresses. Owner and CBC 2016 require a minimum of 50% (by weight) of all non-hazardous construction materials be recycled, composted and/or salvaged. Question Deadline 06/18/2024 at 5:00 PM PT

Award

Fire / Police

$10,658,000.00

Public - County

New Construction, Site Work

174

32

242

6

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
119
All Active Projects
60
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2024

November 25, 2024

img_map_placeholder

43700 Tamarisk Dr, Desert Center, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.