BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a bridge / tunnel in Tyndall AFB, Florida. Completed plans call for site work for a bridge / tunnel.

Site Visit Information: Per the solicitation, there is a scheduled site visit for 24 June 2024 at 1000am CST. Please refer to the Site Visit Information attachment, which includes instructions for individuals with base access, and those that need to be signed on at the Visitor Center. This also includes parking information. An image of where to park can be found in the Location of Parking attachment. Amendment 001 (FA481924R00170001) was posted on 13 June 2024. This amendment is to update the proposal due date to 15 July 2024 on block 13a of the solicitation. This requirement is comprised of construction of an anti-terrorism force protection (ATFP) fence on Tyndall AFB, FL and the related disciplines of work as specific tasks in the Scope of Work. The area being fenced is tie-in for the base perimeter fence at the four (4) quadrants surrounding the Louisiana Avenue Bridge (overpass). Work includes demolition of FDOT fencing that provides a non-ATFP perimeter. The purpose of the fence is to provide security IAW ATFP guidance to meet DoD standards. Project Title: Construct ATFP Fence Louisiana Avenue Bridge Project Location: Tyndall AFB A. NAICS 238990-All Other Specialty Trade Contractors B. The resulting contract will be firm-fixed price contract. See section J for applicable attachments. C. This acquisition has been designated for procurement D. The project magnitude for as an small business set-aside this requirement is IAW FAR 36.204(b) between $25,000 and $100,000 E. Performance and Payment Bonds shall be obtained IAW FAR 28.102 F. The construction wage requirements statute WD #FL20240005 Building applies to G. The Pernod of Performance is 100 Calendar Deys after Notice to Proceed (NTP) this project 52.232-18 Availability of Funds (Apr 1984) Funds are not presently available for this contract. The Government s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. Questions and Answers are due on 28 June 2024 at 10:00 AM, CST. Proposals are due no later than 15 July 2024 at 10:00 am, CST. Recommend all offerors (via telephone call to appropriate Government POC) confirm receipt of all emailed proposals and revisions. Ensure you acknowledge all amendments in your proposal. The contractor shall begin performance within 10 calendar days and complete it within 100 calendar days after receiving *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$100,000.00

Public - Federal

Site Work

12

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
18
Bidding Soon
201
All Active Projects
100
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2024

August 14, 2024

img_map_placeholder

2580 E Hwy 98, Tyndall AFB, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.