BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Silverton, Colorado. Completed plans call for site work for a road / highway.

The Hematite and Burns Gulch Project is located near Silverton, Colorado in San Juan County. The mine locations are primarily on the Hematite Lake Trail and Burns Gulch 4WD road. There are also 2 adits in Minnie Gulch, 1 shaft in Dry Gulch, and a shaft and an adit in Burrows Gulch. Almost all sites are located north of Silverton along County Road 2, except for the Dry Gulch shaft which is located up County Road 110 (Cement Creek) The Hematite and Burns Gulch Projects involves safeguarding a total of 21 mines comprised of 16 adits and 5 shafts. Mine sites are located primarily near the town of Silverton, Colorado along the Hematite Lake Trail which is 3.5 miles north of town on County Road 2 and in Burns Gulch 10 miles north of the town of Silverton, Colorado along County Road 2 (BG1 thru BG6) Additionally, dispersed around the Silverton area there are two mines located in Burrows Gulch (BG1 & BG2) 13 miles on County Road 2, and two features in Minnie Gulch (MG1 & MG2) 9 miles north of Silverton along County Road 2, two features 2.5 miles south of Silverton on the King Claim along Hwy 550 (K2 & K3), and one hole located at the head of Dry Gulch 7 miles northwest of Silverton up Cement Creek Road (DG1). For clarification purposes there are two sets of holes labeled BG1 and BG2. There is a BG1 and a BG2 in Burns Gulch, and there is a BG1 and BG2 in Burrows Gulch. This overlap in naming happened because two projects were combined into one. The bidder is advised to make sure to keep BG1 and BG2 and their respective closures and costs clear when submitting their bid. The bid schedule will help clarify by identifying whether BG1 or BG2 is in Burns Gulch or Burrows Gulch. The project is scheduled for construction between September 1, 2024 and October 15, 2024. This includes ten (10) days mobilization time. These dates have been selected due to nesting brown-capped rosy-finch birds. No modifications to the project dates will be allowed. The time of completion allowed for the project is 45 calendar days after receipt of the Notice to Proceed. This includes ten (10) days mobilization time Bid Bond. No Bid Bond is required for Documented Quotes Questions pertaining to waivers should be directed to the financial assistance awarding officer

Post-Bid

Roads / Highways

$2,396,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
8
Bidding Soon
82
All Active Projects
32
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

September 4, 2024

img_map_placeholder

To Be Determined, Silverton, CO


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.