BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000354105 EPA's Lead and Copper Rule Revisions requires water utilities to develop a system-wide lead service line inventory and lead service line replacement plan by October 2024. The inventory is a massive effort and requires identifying the service line material on both the city and customer owned service lines. The LCRR requires lead service lines and galvanized service lines that may have been downstream of a lead line (known Galvanized Requiring Replacement or GRR) to be replaced at a rate determined by future compliance sampling results. The Work to be performed under the Lead Service Line Inventory Project: Potholing Phase 2, consists of furnishing all labor, traffic control, materials, equipment, tools, and supplies for approximately 3,000 addresses in Original Aurora to determine water service line material in accordance with the City of Aurora and State Guidelines. Three potholes are anticipated for each service line, two on the private side of the meter and one in the public right-of-way. Question Deadline 06/12/2024 at 2:00 PM MT Questions are submitted online No, Any questions must be submitted in writing by email to Beverly Rizzolo, Project Manager, at brizzolo@auroragov.org, and to Nathan Jones, Contract Administrator at njones@auroragov.org. Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond in an amount of not less than five percent (5%) of the amount of the Bid. In addition, the bid guarantee shall be accompanied in the same file as the bid. The Contract Documents require that all work be Substantially Complete by December 31, 2024 with Final Completion by March 30, 2025 Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $200.00 per day. The estimated cost for this project is from $1,500,000.00 to $3,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$3,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
70
Bidding Soon
973
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

August 26, 2024

img_map_placeholder

To Be Determined, Aurora, CO


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.