Site work, paving and new construction of a mixed-use development in Aurora, Colorado. Completed plans call for the construction of a power facility; for site work for a power facility; road / highway; for paving for a road / highway; and water / sewer project.
Construct all necessary facilities to provide utility and backup power to the Space-Based InfraRed Systems (SBIRS) mission in Building 442. Facilities to be constructed include a new power plant (B451) to house the backup generators and spaces for operational support; the backup generators; fuel storage and fuel offload facilities; commercial power; new transformers; medium voltage switches, manholes, and Underground Primary Distribution power lines; load bank connection and switching equipment; replicated powerplant controls in Building 433; and all necessary support. Provide full load capability of 3.2MW after derating for operations and environmental factors with redundant capacity components to maintain the power resiliency required by the mission. The estimated construction cost of this project is between $25,000,000 and $100,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PID- CRWU223006 Question Deadline 09/29/2025 Technical inquiries and questions relating to technical requirements, proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at online no later than ten (10) calendar days before due date of proposals, in order that they may be given consideration or actions taken prior to receipt of offers. Site visit details: An Entry Authorization Letter (EAL) form and DBIDS request spreadsheet are required for any contractor needing access to the secured area. Both forms are attached. Please submit to Rizza Fattore, (720) 692-6264, riza.p.fattore@usace.army.mil, via DoD SAFE no later than September 16, 2025.
GC Bidding
Power Plant
$100,000,000.00
Public - Federal
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 6, 2026
March 6, 2026
To Be Determined, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Jun 27 2024
Aurora, CO
Bid Date: Jun 25 2024
Aurora, CO
Bid Date: Jun 18 2024
Aurora, CO
Bid Date: May 12 2021
Aurora, CO
Bid Date: Nov 23 2020
Aurora, CO
Bid Date: Jun 27 2024
Aurora, CO
Bid Date: Jun 12 2024
Aurora, CO
--
Aurora, CO
Bid Date: Jun 24 2024
Aurora, CO
Bid Date: Jun 11 2024
Aurora, CO
Bid Date: May 03 2019
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.