BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Kirksville, Missouri. Completed plans call for the construction of a sidewalk / parking lot; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; and transportation facility.

Site Directions: 27161 David Hall Trail, Kirksville, MO 63501 Sanitary Sewer (Gravity), Street Lighting / Streetlight Improvements, Paving - Concrete, Buildings/Public, Electrical and Controls, Construction, Demolition/Building Removal/Hauling/Salvage, Sidewalks/Curbs/Gutters, Control Panels Replacement/Repair/New Installation, Fittings and Valves, Fencing/Guardrails/Handrails, Asphalt Pulverizing, Excavation, Pavement Removal, Erosion Control - Temporary, Landscaping - Seeding, Paving (Asphalt or Concrete), Restrooms, Cement Subgrade, Plumbing, Parking Lots/Ramps, Storm Drain and Paving, Lagoon Improvements, Mechanical Systems, Masonry Construction & Restoration, Furniture, Fixtures, Equipment, Windows, Signage, Flooring/Carpeting, Doors, Asbestos Abatement, Exterior Insulation & Finish Systems, Water Utilities, Fiber Optics, Audio/Video, Concrete/Formed/Flatwork/Foundation, Concrete Walkway, Concrete Pavement, Grade and Surface, Pavement Resurface and Rehabilitation, Electrical, Airport Lighting, Gas Line (New/Repair/Relocation), Drainage, Airport Equipment, Heating, Ventilation, Air Conditioning (HVAC), Welding, Roofing, Painting, Curbs, Buildings Commercial and Private The new terminal will be 6,400 square feet with accommodations of up to 30 passengers in the Hold Room. The facilities include one TSA checkpoint and one ticketing counter and baggage claim for a single airline. A Parking lot expansion and site improvements will also be included. Schedule I - Construct New Terminal Building Schedule II- Reconstruct Terminal Parking Lot Schedule III- Demolish Existing Terminal and Constru ct New Parking Lot All questions regarding the bid are to be directed to Adam Acree with Jviation, a Woolpert Company, 720 S. Colorado Blvd., Suite 1200-S, Glendale, Colorado, 80246, (303) 947-9074, or email adam.acree@woolpert.com. Question Deadline 06/24/2024 at 5:00 PM CT

Post-Bid

Transportation Terminals

$12,500,000.00

Public - City

New Construction, Paving, Site Work

97

22

117

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
19
Bidding Soon
222
All Active Projects
109
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

August 26, 2024

img_map_placeholder

27161 David Hall Trail, Kirksville, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.