BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Florissant, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Parking Lot Asphalt Replacement - The Hazelwood School District is seeking bid proposals for asphalt replacement at Central, West, & Southeast Middle School. Any questions regarding the specifications are to be directed to Danielle Thomas, Director of Purchasing & Supplier Diversity no later than May 21, 2024 at 12:00p.m. through the Vendor Registry online question submission process via the district's website. All work will need to be performed no earlier than July 1, 2024, and be complete by August 2, 2024. Central Middle School | 2" Mill and Overlay 1. Approximately 10,700 square yards of new asphalt surface will be installed. 2. All work will be completed in 1 trip(s). 3. Work areas will be barricaded for the duration of the project. 4. Rotomill the existing asphalt surface to a depth of 2 inches (2"). 5. All surfaces to be paved will be cleaned using blowers and power brooms. 6. SS-1 will be applied at a rate of .1 gallon to ensure proper adhesion between new and existing asphalt surfaces. 7. Leveling: We will level low and depressed areas by installing tons of asphalt leveling surface. This will raise low areas and minimize water ponding. 8. 2 inches of compacted hot mix asphalt will be machine laid and then rolled using 3-to-5-ton vibratory steel drum rollers. The specified depth is after compaction. 9. Edges will be tapered and beveled to meet the existing surface. 10. The new asphalt areas will be restriped per existing layout or with changes given by Director of Maintenance prior to work, with one coat of traffic paint. All curb stops will need to be re-installed after the lot is striped. Any wheel stops that are found to be in need of repair shall be reported to the director of Maintenace. Southeast Middle School | 2" Mill and Overlay 1. Approximately 13,720 square yards of new asphalt surface will be installed. 2. All work will be completed in 1 trip(s). 3. Work areas will be barricaded for the duration of the project. 4. Rotomill the existing asphalt surface to a depth of 2 inches (2"). 5. All surfaces to be paved will be cleaned using blowers and power brooms. 6. SS-1 will be applied at a rate of .1 gallon to ensure proper adhesion between new and existing asphalt surfaces. 7. Leveling: We will level low and depressed areas by installing tons of asphalt leveling surface. This will raise low areas and minimize water ponding. 8. 2 inches of compacted hot mix asphalt will be machine laid and then rolled using 3-to-5-ton vibratory steel drum rollers. The specified depth is after compaction. 9. Edges will be tapered and beveled to meet the existing surface. 10. The new asphalt areas will be restriped per existing layout or with changes given by Director of Maintenance prior to work, with one coat of traffic paint. All curb stops will need to be re-installed after the lot is striped. Any wheel stops that are found to be in need of repair shall be reported to the Director of Maintenance. West Middle School | 2" Mill and Overlay 1. Approximately 12,400 square yards of new asphalt surface will be installed. 2. All work will be completed in 1 trip(s). 3. Work areas will be barricaded for the duration of the project. 4. Rotomill the existing asphalt surface to a depth of 2 inches (2"). 5. All surfaces to be paved will be cleaned using blowers and power brooms. 6. SS-1 will be applied at a rate of .1 gallon to ensure proper adhesion between new and existing asphalt surfaces. 7. Leveling: We will level low and depressed areas by installing tons of asphalt leveling surface. This will raise low areas and minimize water ponding. 8. 2 inches of compacted hot mix asphalt will be machine laid and then rolled using 3-to-5-ton vibratory steel drum rollers. The specified depth is after compaction. 9. Edges will be tapered and beveled to meet the existing surface. 10. The new asphalt areas will be restriped per existing layout or with changes given by Director of Maintenance prior to work, with one coat of traffic paint. All curb stops will need to be re-installed after the lot is striped. Any wheel stops that are found to be in need of repair shall be reported to the Director of Maintenance. 25% for MBEs and 5% for WBEs

Post-Bid

Sidewalks / Parking Lot

$250,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
104
Bidding Soon
1,487
All Active Projects
653
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 10, 2024

July 1, 2024

August 2, 2024

img_map_placeholder

Multiple Locations, Florissant, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.