EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a bridge / tunnel in Sayre, Pennsylvania. Completed plans call for site work for a bridge / tunnel.

Culvert Replacement Project: Elmira Street over Dry Brook Creek which involves replacing an existing corrugated metal pipe culvert with a new precast concrete box culvert with precast concrete end sections. Bond Notes: Each BID must be accompanied by a Bid Bond payable to the Owner for ten percent (10%) of the total amount of the BID. As soon as the BID prices have been compared, the Owner will return the Bonds of all except the three lowest responsible bidders. When the Agreement is executed, the bonds of the two remaining unsuccessful bidders will be returned. Bidders must submit with their initial bid, a statement as to whether they have previously performed work subject to the President's Executive Order No. 11246 (30 F.R. 12319-25) "Equal Opportunity Clause". The Bidder acknowledges that this bid is for a public works contract and bidder is therefore subject to the provisions, duties, obligations and penalties of the Public Works Employment Verification Act, 43 P.S. 167.1 - 167.11, which is incorporated herein by reference. Doc Notes: Contact the Engineer, Larson Design Group, 1000 Commerce Park Drive, Suite 201, Williamsport, PA 17701; 570-323-6603 between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday, with any questions pertaining to access and use of the website. Owner Rights: The Owner reserves the right to reject any or all bids, to waive any informalities in the bidding, or to limit the scope of work involved. No bidder may withdraw a bid within sixty (60) days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period; the time may be extended by mutual agreement between the Owner and the Bidder. All Contractors must be PennDOT prequalified. All Contractors shall comply with all State and Federal laws prohibiting discrimination in hiring employment opportunities. PA prevailing wage rates are required for this Contract. The deadline for submitting questions is 72 hours before the let date and time. Question Deadline 06/21/2024

Award

Bridges / Tunnels

$547,000.00

Public - City

Site Work

21

9

6

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
68
Bidding Soon
823
All Active Projects
370
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2024

August 25, 2024

img_map_placeholder

Elmira St, Sayre, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Culvert Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.