BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2024 at 8:00 PM

Updated June 8, 2024

Site work for a water / sewer project in Vinton, Virginia. Conceptual plans call for site work for a water / sewer project.

The Western Virginia Water Authority (Authority) seeks proposals from qualified engineering consultants to provide professional engineering services for construction administration, oversight, and engineering support required during the construction phase of the Beaverdam Creek Dam Spillway Replacement and Dam Improvements project. The scope of services consists of engineering consultation to facilitate the administration and construction of the Beaverdam Creek Dam Spillway Replacement and Dam Improvements Project. The Authority will staff the project with a designated project manager and inspector. The selected offeror will provide engineering support to the Authority during construction. Services required are generally defined below. a. Review and respond to Contractor submittals. b. Review and respond to Contractor requests for information. c. Review and respond to change order requests. d. Review and approve pay application requests from Contractor to WVWA. e. Participate in Monthly progress meetings. f. Provide all Quality Assurance laboratory testing required throughout construction for concrete and fill placed by the Contractor. Review results for accuracy and conformance with the Technical Specifications. g. Provide on-site staffing as required to ensure that work is performed in accordance with plans and specifications. h. Complete project closeout to include sealed as built drawings and all inspections and reports required by the Department of Conservation and Recreation dam construction permit. The estimated duration of project construction is 645 days and is expected to start July 1st 2024. Question Deadline 06/06/2024 at 5:00 PM ET Questions pertaining to this proposal shall be submitted shall be directed to: Roger Blankenship, P.E. Director of Plant Assets - Water Quality e-mail: roger.blankenship@westernvawater.org The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$20,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
73
Bidding Soon
710
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

Project location map

To Be Determined, Vinton, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.