BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Oak View, California. Contact the soliciting agency for additional information.

The District invites qualified firms to submit their Statement of Qualifications and Proposal for the Matilija Groundwater Supply project. Statements of Qualification and Proposal are due no later than June 27, 2024, at 4:00 p.m. Two bid package are anticipated, well drilling and well equipping. Engineering services are anticipated to include: a) Preliminary engineering, utility research, and geotechnical investigation b) Preparation of plans, specifications, and cost estimates c) Topographic survey for design purposes d) Coordination with environmental consultant for implementation of Mitigated Negative Declaration and environmental studies related to CEQA compliance e) Coordination with Kear Groundwater, the District's hydrogeologist consultant and technical adviser for this project f) Permitting assistance and coordination with County of Ventura for well permit g) Bid phase assistance such as: pre-bid meeting attendance; preparation of addenda; evaluation of bids; and recommendation for award h) Construction phase assistance such as: review of shop drawings and submittals; responses to Requests for Information; responses to Requests for Clarification; review of Change Order requests; and attendance at construction meetings i) Inspection services during construction j) Preparation of record drawings The proposal component of the submittal to the District should include a project understanding, approach, scope, fee, and schedule. A preliminary schedule with anticipated tasks and deliverables is provided in Table 1. Questions may be directed to Julia Aranda, PE, Engineering Manager at jaranda@casitaswater.com no later than June 24, 2024. Casitas Municipal Water District (Casitas or District) is requesting Statements of Qualifications/Proposals (SOQ/P) from firms to provide engineering services for the Matilija Groundwater Supply Deep Water Well project. Services expected to be provided include: a) General civil, mechanical, geotechnical, structural, electrical, and instrumentation design engineering services related to drilling and outfitting a pilot water well at an approximate depth of 7,000 feet b) Engineering support services during bidding and construction c) Permitting support to acquire permits from regulatory agencies including County of Ventura d) Support for preparation of an Initial Study/Mitigated Negative Declaration (to be prepared by others) e) Engineering services during construction This request for qualifications/proposals contains a project description, scope of work, elements of proposal, selection process, general terms and conditions, and agreement. The intent of the RFQ/P is to solicit a concise proposal to provide the services described within this (RFQ/P) including design engineering services and construction support for the project described herein. Interviews (if needed) Wednesday, July 17, 2024 Board Action Wednesday, August 14, 2024 Kick Off Meeting Wednesday, August 28, 2024 Geotech Monday, September 2, 2024 Friday, September 27, 2024 Survey Monday, September 2, 2024 Friday, September 27, 2024 WELL DRILLING 60% Design Monday, September 30, 2024 Wednesday, October 30, 2024 District Review Thursday, October 31, 2024 Thursday, November 14, 2024 90% Design Friday, November 15, 2024 Friday, December 6, 2024 District Review Monday, December 9, 2024 Monday, December 23, 2024 100% Design Monday, December 23, 2024 Monday, January 13, 2025 District Review Monday, January 13, 2025 Monday, January 20, 2025 Final Design Monday, January 20, 2025 Monday, January 27, 2025 Notice Inviting Bids Wednesday, January 29, 2025 Mandatory Pre-Bid Meeting Wednesday, February 12, 2025 Bids Due Wednesday, February 26, 2025 Board Award Wednesday, March 12, 2025 Notice To Proceed Thursday, March 27, 2025 Submittals Friday, March 28, 2025 Monday, April 28, 2025 Mobilization Monday, May 12, 2025 Friday, May 16, 2025 Well Drilling Monday, May 19, 2025 Friday, June 6, 2025 Demobilization Monday, June 9, 2025 Friday, June 13, 2025 WELL EQUIPPING 60% Design Monday, June 16, 2025 Wednesday, July 16, 2025 District Review Thursday, July 17, 2025 Thursday, July 31, 2025 90% Design Friday, August 1, 2025 Friday, August 22, 2025 District Review Monday, August 25, 2025 Monday, September 8, 2025 100% Design Monday, September 8, 2025 Monday, September 29, 2025 District Review Monday, September 29, 2025 Monday, October 6, 2025 Final Design Monday, October 6, 2025 Monday, October 13, 2025 Notice Inviting Bids Wednesday, October 15, 2025 Mandatory Pre-Bid Meeting Wednesday, October 29, 2025 Bids Due Wednesday, November 12, 2025 Board Award Wednesday, November 26, 2025 Notice To Proceed Thursday, December 11, 2025 Submittals Friday, December 12, 2025 Monday, January 12, 2026 Mobilization Monday, January 26, 2026 Friday, January 30, 2026 Piping Construction Monday, February 2, 2026 Wednesday, March 4, 2026 Demobilization Saturday, March 7, 2026 Wednesday, March 11, 2026 The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
58
Bidding Soon
1,487
All Active Projects
634
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2026

img_map_placeholder

Multiple Locations, Oak View, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.