Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Bogue, Kansas. Completed plans call for site work for a playground / park / athletic field.
The purpose of this amendment (0001) is to provide answers to questions asked thus far. Reminder that all amendments must be acknowledged by the due date and time of quotes. Q1. 60x60 = 240 - 28 feet of gate = 212. My math brings the total footage to 212 not 210. This brings quantities out of balance. I can over stretch the chain-link to accommodate the shortage but ordering the correct amount would be preferred. A1: See A1, A2, A3, A4, A5 below. Q2. 11 sticks of top rail not 10 (they are 21 feet in length). Industry best practices is not to put a 3 foot piece of rail at the end. A2: See A1, A2, A3, A4, A5 below. Q3. Sleeves at 6 required not 10 (saves 4). A3: See A1, A2, A3, A4, A5 below. Q4. Line posts at 17 not 19 (saves 2 posts). Industry standard is max 10' o/c spacing. A4: See A1, A2, A3, A4, A5 below. Q5. The tension wire was called out in pounds. Did this include the extra footage needed to make the termination wraps We typically order by the footage required. A5: See A1, A2, A3, A4, A5 below. A1, A2, A3, A4, A5. Regarding material differences between what is listed in the A06 Specs.pdf document and what each quoter believes is required, quoters shall review the material list and document any missing or additional materials needed to install the chain link fence to the standards described in the solicitation documents. Identify this information in your response to the solicitation including associated pricing. All work shall comply with the solicitation and all solicitation documents. If a contract is awarded, it will be awarded as a firm fixed price contract. Q6. There was no gate hardware listed, does the supplier automatically include them A6: Only the gate hardware specified in the A06 Specs.pdf document is included. If you believe additional or substitutions are needed, then include that with your quote. Q7: Page 7 of the Project Specification mentions at "D. Period of performance: Work shall be completed within 60 calendar days of the start date provided on the Notice to Proceed". But on page 8 of the RFQ Solicitation it says, "complete the entire work ready for use not later than 30 calendar days after receipt of Notice to Proceed". Which is correct, 60 days or 30 days A7: 60 days after receipt of Notice to Proceed. Q8. On page 21 of the Specification sheet, the last entry says "(2) 12' x 8' SLIDE GATES". Can you clarify what is meant by slide gate I'm not clear as to what that means. If you're looking for a cantilever gate, two would not be needed. If it is another type, I need more info as to what you have type in mind. A8: There are two gate panels each 12-foot by 8-foot. Instead of having hardware that creates a pivot point (hinge) at the anchor post, this has rails that with rollers attached to the gate allowing the gate to slide open instead of swinging open. Q9. Concrete embedment of corner and gate posts at only 11 inches. Terminal posts are set 1 inch high to accommodate the post cap. At a minimum, the 3 gate posts should be full depth preferably all terminals. A9: Government awaiting clarification from the asker of the question. Construct Government-provided Chain Link Fence at Nicodemus National Historic Site, Nicodemus, KS 67625 Work Location: Nicodemus National Historic Site in Nicodemus, KS 67625 Project Magnitude: Less than $25,000 Project Location: This property does not have an active mailing address associated with it. The Open Records for Kansas Appraiser list location the address as 00000 Fifth Street Bogue. Note Bogue Kansas and Nicodemus Kansas share the same zip code and similar street names. THIS WORK IS IN NICODEMUS KS. 39' 23' 27" N 99'37'07" W Work consists of: Installing a 60' x 60' x 8' high chain link fence with a 24' double gate and 4' personnel gate. The fencing material will be supplied by the NPS, and the contractor will need to supply the concrete and labor to install the fence. Installing the government, furnish material to construct a 60-foot x 60-foot X 8-foot chain link fence around the perimeter of a storage area. This will include two gate locations, a 24' wide double gate and a 4' wide personnel gate. The double gate will be located centered on the north elevation of the project. The personnel gate will be located on the east side at the north end one section from the corner post. Contractor will confirm exact gate locations with COR prior to installation. Fence will be located 2' inside the western edge of the property boundary which is marked on the North and south ends with Tee posts marked US Property. The fence will also be located 2' north of the southern boundary 90 degrees to the western property line. Contractor will work with COR for final alignment of fence.
Post-Bid
Playgrounds / Parks / Athletic Fields
$25,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 3, 2024
August 2, 2024
304 Washington Ave, Bogue, KS
Related To This Project
Bogue, KS
Bid Date: May 24 2024
Bogue, KS
Bid Date: Jun 20 2023
Bogue, KS
Bid Date: Aug 08 2022
Topeka, KS
Bid Date: Jun 14 2024
Manhattan, KS
Bid Date: Jun 25 2024
Courtland, KS
Bid Date: Jun 21 2024
Topeka, KS
Bid Date: Jun 25 2024
Shawnee Mission, KS
--
Topeka, KS
Bid Date: Jun 03 2024
Topeka, KS
Bid Date: Jun 25 2024
Topeka, KS
Bid Date: Jun 27 2024
Hutchinson, KS
Bid Date: Jun 26 2024
Overland Park, KS
Bid Date: Jun 19 2024
Topeka, KS
Bid Date: Jun 12 2024
Topeka, KS
Bid Date: Jun 13 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.