BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 18, 2024 at 8:00 PM

Updated June 19, 2024

Site work and paving for a mixed-use development in Fridley, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Question Deadline 06/11/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. The work includes the construction of approximately: 446 SY - Concrete Pavement Replacement (6" Depth) 7 EA - Install Drainage Structure *Special (Hydrodynamic Separator) 446 SY - Concrete Pavement Removal (Full Depth) 6 EA - Remove Drainage Structure COMPLETION OF WORK: All work under the Contract must be complete by November 22, 2024. BID SECURITY: A proposal bond in the amount of not less than 5 percent of the total amount bid, drawn in favor of City of Fridley shall accompany each bid. OWNERS RIGHTS RESERVED: The Owner reserves the right to reject any or all bids and to waive any irregularities and informalities therein and to award the Contract to other than the lowest bidder if, in their discretion, the interest of the Owner would be best served thereby. No bid may be withdrawn for a period of sixty (60) days.

Award

Water / Sewer

$331,475.00

Public - City

Paving, Site Work

24

9

8

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
123
Bidding Soon
1,584
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2024

July 18, 2024

Project location map

Multiple Locations, Fridley, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.