BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a playground / park / athletic field in Cumberland, Kentucky. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

The project is located at the Bullock Overlook at Kingdom Come State Park. The highest point of any State Park in Kentucky. The project includes (3) Cabins which each include a large central room w/ a queen bed, a bunk bed, table & chairs w/ an enclosed bathroom to the rear with a loft above. For R1-Use a stair is required for access to the upper level. A small nook is provided for a mini fridge and a microwave. All three cabins are sized for handicap use although it would make the most sense to only designate the cabin close to the house for ADA use because of its level access and van accessible parking spaces nearby. All cabins would have an exterior porch. These loft-style cabin structures would have basic concrete foundation systems w/ CMU stem walls, and a slab on grade for stick-frame construction. Exterior cladding shall be Cementitious Siding while roof would be asphalt shingles with ice & water shield. The interior would be horizontal v-groove pine with a clear poly finish. Flooring would be LVT. Water and electric capacity exist up on the hilltop for the scope of new work. A new transformer will be needed to feed the new cabins as well as a new cluster-type septic system. Heating and cooling for the new cabins will be provided by PTAC units with additional electric heat in the bathrooms. 670-CAME-KC02-00 All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer. Unless otherwise specified in the Solicitation, questions received less than ten (10) calendar days prior to the date for receipt of bids may not be answered

Bid Results

Playgrounds / Parks / Athletic Fields

$1,149,000.00

Public - State/Provincial

LEED Certification, New Construction, Site Work

19

20

2

7

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
92
Bidding Soon
830
All Active Projects
386
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 16, 2024

July 25, 2024

February 6, 2025

img_map_placeholder

502 Park Rd, Cumberland, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.