Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 20, 2024 at 8:00 PM
Updated June 26, 2024
Site work for a mixed-use development in Cache Creek, British Columbia. Completed plans call for site work for a bridge / tunnel; road / highway; and sidewalk / parking lot.
The Owner is seeking to engage a general contractor to complete the various infrastructure recovery projects related to the 2023 Cache Creek Flood. There are four (4) separate projects, which will need to be invoiced independently. All works will be done in accordance with MMCD and supplemental specifications outlined in the enclosed sample agreement. The completion of the following work is expected (approximate quantities): Project A - Todd Road Bridge Repairs Remove and dispose of broken asphalt and base material. Supply and compact structural fill to return bridge approaches to original contours. Reestablish rip rap armoring along shoreline Construct lock block retaining wall to protect timber piles. Supply and install concrete Deadman blocks and tie to existing abutment wall. Supply asphalt, base and subbase material to repave Approximately 160m2 of road on bridge approaches. Replace bridge deck wear material - 170 pieces 4"x10"x16' No.2 or better Douglas fir. 1 - Remove and replace Storm manhole 1 - Remove and replace Hydrant assembly 1 - Relocate gate valve Project B - Fire Department Apron Remove and dispose of existing concrete apron and reinforcement Form and pour new reinforced concrete apron. Approx 200 m2 Project C- Stage Road Retaining wall. Provide traffic control on Stage Road during construction. Saw cut, remove and dispose of existing asphalt road, curb, and sidewalk at excavation limits. Remove and reinstate street light conduit and chain link fence. Excavate and disassemble concrete block retaining wall. Reconstruct wall including geotextile and geogrid. Approx 20 m2 of wall face area. Replace approx. 20 m2 of Concrete sidewalk and 13 linear meter of curb and gutter as per MMCD standard drawing C-2. Replace approximately 30 m2 of Asphalt roadway. Project D - Hwy 97 Sidewalk replacement Provide traffic control on Hwy 97 during construction. Remove and replace approx. 125 m2 concrete sidewalk and 66 linear meter of curb and gutter as per MMCD standard drawing C-3.
Post-Bid
Bridges / Tunnels
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2024
July 2, 2024
Multiple Locations, Cache Creek, BC
Related To This Project
Cache Creek, BC
--
Cache Creek, BC
Bid Date: Dec 03 2024
Cache Creek, BC
Bid Date: Dec 20 2024
Cache Creek, BC
Bid Date: Feb 06 2025
Cache Creek, BC
Bid Date: May 21 2025
Cache Creek, BC
Bid Date: Nov 30 2025
Cache Creek, BC
Bid Date: Nov 24 2025
Cache Creek, BC
Bid Date: Dec 12 2025
Cache Creek, BC
Bid Date: Feb 20 2024
Cache Creek, BC
Bid Date: Feb 13 2024
Cache Creek, BC
Bid Date: Nov 28 2023
Cache Creek, BC
Bid Date: Sep 07 2023
Cache Creek, BC
Bid Date: Aug 02 2023
Cache Creek, BC
Bid Date: Jul 20 2023
Cache Creek, BC
Bid Date: Jul 20 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
