BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Danbury, Connecticut. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Bids will be received for furnishing all labor, materials, tools and equipment necessary to construct, equip and finish the above project, in accordance with the documents. A satisfactory Bid Guarantee (Over $25K ONLY) in an amount equal to a minimum of five percent (5%) of the Base Bid shall be submitted with each bid. If the Bid Guarantee is in the form of a Bid Bond, the Bid Bond shall be made payable to the Housing Authority of the City of Danbury and shall be properly executed by the Bidder and Acceptable Sureties. Individual sureties shall not be considered. U.S. Treasury Circular No. 570, published annually in the Federal Register, lists companies approved to act as surety on bonds securing Government contracts, the maximum underwriting limits on each contract bonded and the States in which each company is licensed to do business. Use of this Circular is mandatory. The successful Bidder will be Required to furnish and pay for a Performance and Payment Bond (Over $100K ONLY), in the amount of 100% of the Contract Amount, or a 20% cash escrow or a 25% irrevocable letter of credit, in the form included in the Project Specifications. Surety companies providing performance and payment bond(s) must be licensed to do business in Connecticut and be approved as sureties on Government contracts pursuant to U.S. Treasury Circular No. 570, published annually in the Federal Register. The Contractor shall procure at his own expense Workmen's Compensation, Comprehensive General Liability, Automobile Liability and other Insurance with coverages and limits as defined in the Specifications. Certificates of Insurance with the above coverage must be submitted before starting work on the project. Thirty day notice is required before cancellation. Attention is called to the provisions for equal opportunity and payment of not less than the minimum salaries and wages as set forth in the specifications. The HACD reserves the right to reject any or all bids or to waive any informality in the bidding. All bid forms must be fully completed when submitted. No bid shall be withdrawn for a period of ninety (90) days subsequent to the openings of bids without the consent of the HACD. The successful Bidder will be provided with three (3) sets of the Contract Documents. Any additional sets will be made available at additional cost. In the event of an identical dollar amount for the total of the Base Bid, the lower bidder will be determined by the HACD as the bidder with the earliest recorded date and time as received by the HACD. This project is federally assisted. Therefore, bidders must comply with the following requirements: Housing and Urban Development Act of 1968; Equal Opportunity provisions of Executive Order 11246; Non- Discrimination provision of Title VI of the Civil Rights Act of 1964; Labor Standards provisions of the Davis-Bacon Act and related acts and Contract Work Hours Standards Act; prevailing wage determinations as issued by the United States Department of Labor; and all applicable provisions under Title I of the Housing and Community Development Act of 1974. The last day for questions is 8 days prior to bid opening. Question Deadline 06/18/2024 Any questions that arise after the pre-bid conference shall be addressed to the architect in writing. The last day for questions is 8 days prior to bid opening.

Final Planning

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

11

13

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
451
Active Projects
265
Bidding Soon
4,147
All Active Projects
1,675
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

August 2, 2024

img_map_placeholder

198 Main St, Danbury, CT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.